Demonstrating offshore production of green hydrogen
HORIZON JU Innovation Actions
Basic Information
- Identifier
- HORIZON-JTI-CLEANH2-2022-01-10
- Programme
- HORIZON-JTI-CLEANH2-2022
- Programme Period
- 2021 - 2027
- Status
- Closed (31094503)
- Opening Date
- March 31, 2022
- Deadline
- September 20, 2022
- Deadline Model
- single-stage
- Budget
- €121,000,000
- Min Grant Amount
- €7,000,000
- Max Grant Amount
- €7,000,000
- Expected Number of Grants
- 1
- Keywords
- Civil engineeringMechanical engineeringTechnology managementEnvironmental engineeringhydrogen productionoffshoregreen hydrogen
Description
The European Commission’s “Strategy to Harness the Potential of Offshore Renewable Energy for a Climate Neutral Future”[1] expects renewable energy projects to become increasingly important in most sea basins in Europe, including innovative projects such as offshore hydrogen production. Hydrogen may be produced offshore by achieving an association between wind turbines and electrolysers by various approaches. These include retrofitting an electrolyser to an existing oil & gas platform, building a renewable hydrogen production hub on a man-made island, building a new platform close to a wind farm, or integrating the electrolyser and wind turbine into one offshore assembly. The electricity may be supplied via a private wire, a grid connection, or off-grid. Moreover, offshore produced hydrogen may be exported via existing repurposed or new pipelines (gas blended or pure hydrogen) or by dedicated ships; and a platform may be used for grid balancing and for refuelling ships offshore.
This topic calls for a flagship project demonstration at multi-MW scale, >5MW, of the feasibility of offshore renewable hydrogen production. This may be achieved by either re-using existing offshore electricity/oil/gas infrastructure or using new infrastructure, to export energy as hydrogen rather than electricity and so support the greater integration of renewable power sources into the energy system. It is expected that the electrolyser operation will closely follow the wind power generation profile. This will be one of the first worldwide demonstrations of an offshore multi-MW system integration for renewable hydrogen production and export/use.
Project results are expected to contribute to all of the following outcomes:
- Achievement of a step change regarding experience with the additional safety aspects of hydrogen production offshore and export/use, de-risking future projects and investments;
- Determination of the long-term performance of an offshore electrolyser in terms of integration capabilities, efficiencies, systems balancing, performance degradation, corrosion management and operational costs;
- Evaluation and demonstration of operational, inspection and maintenance requirements of offshore electrolysis process;
- Building upon existing experience and research into suitable offshore renewable hydrogen infrastructures and expanding this knowledge;
- Enabling further roll-out of offshore renewable hydrogen production and export/use;
- Acting as a stepping stone for dedicated offshore electrolysis coupled with windfarms, transporting renewable energy as renewable hydrogen, or the offshore use of renewable hydrogen;
- Provide relevant experience to retrofitting existing electricity/oil/gas offshore infrastructure demonstrating their feasibility and cost competitiveness in the long run.
Proposals should aim to improve understanding of the technical, economic, regulatory and operational benefits and hurdles of producing and exporting offshore renewable hydrogen with direct connection to offshore windfarms.
Project results are expected to contribute to all of the following objectives of the Clean Hydrogen JU SRIA:
- AEL, Electricity consumption @ nominal capacity( kWh/kg) 49, Degradation (%/1,000h) 0.11, Hot idle ramp time (sec) 30, Cold start ramp time (sec) 900;
- PEMEL, Electricity consumption @ nominal capacity( kWh/kg) 52, Degradation (%/1,000h) 0.15, Hot idle ramp time (sec) 1, Cold start ramp time (sec) 10.
This Innovation Action flagship[2] topic will aim to demonstrate offshore production and export/use of hydrogen as a first multi-MW step towards large-scale offshore renewable hydrogen production. The scope covers process design, engineering, construction, procurement, integration with offshore infrastructure and operation of a >5MW electrolysis system at an offshore setting. This can include the supply of renewable electricity, water at the required specification as well as cooling, drying, compression, storages, pipelines and other auxiliaries required to convey and utilise the hydrogen. Accordingly, the project will incur substantial integration costs, both upstream and downstream of the electrolyser, in addition to the costs of the offshore electrolyser itself.
Proposals should address the following:
- Deployment of a system that is designed to be remotely controlled, monitored and autonomously operated to minimise operational costs, while also allowing ready access for essential maintenance purposes;
- Evaluation of the operational, inspection and maintenance requirements of offshore electrolysis systems;
- Operation of the offshore electrolyser and hydrogen export/storage/use for two complete seasonal cycles (24 months). Projects should record all relevant operating data (e.g.: electricity input, hydrogen production and export, system degradation, system fault/trips and root cause analysis) to allow the feasibility of offshore renewable electrolysis to be fully assessed;
- Determination of the performance of the offshore electrolyser in terms of efficiency, performance degradation, operational and maintenance costs;
- If relevant to the electrolyser site, an assessment of economic impact of re-using existing offshore infrastructure compared with developing new offshore infrastructure. KPIs regarding accommodation ratios (MW/m²), cost of installed production (€/MW), etc, shall be defined as appropriate in the proposals to build the assessment;
- A techno-economic comparison of the chosen approach to offshore hydrogen production and transport by pipeline with an otherwise similar approach on land that is based on onshore wind power;
- Assessment of the efficient use of the available renewable energy and of the best control strategies to optimise the plant performances based on the measured process operation data. For this purpose, proposals shall define KPIs regarding availability, efficiency, LCOH, etc;
- Assessment of the environmental impact in terms of avoided CO2 emissions resulting from the utilisation of the renewable hydrogen produced offshore. A preliminary estimation of the CO2 avoided emission is expected already in the proposal;
- Describe how learnings will be communicated and dissemination will occur beyond the consortium, including regions in Europe with significant potential for offshore renewable hydrogen production.
The offshore conditions, stringent safety requirements, securing a renewable electricity supply, EPC requirements, and the difficult accessibility makes this call very challenging compared with land-based deployments of electrolysers in the electricity grid. Hence to address adequately the challenges of this project, the consortium should assess:
- Technical and specific hydrogen expertise for the design, provision, integration, safety and operation of the offshore electrolysis process devices and associated hydrogen export/use
- The necessary contractual and commercial expertise to market the hydrogen;
- The end-use of the produced and exported hydrogen;
- The potential sustainability of the deployed renewable production plant beyond the demonstration phase;
- Obtaining the necessary permitting and regulatory approvals as required for the timeframe of the project;
- Legal, safety and regulatory expertise related.
Proposals are expected to demonstrate important additional technological advancement compared to the FCH JU project OYSTER[3].
This topic encourages the deployment of sustainable transportation of hydrogen methods by soliciting the planning of «medium range and backbone transmission infrastructures» in line with the “Hydrogen Strategy for a Climate Neutral Europe[4]”. In addition, it is important that the offshore production of hydrogen conforms with Europe’s general commitment to achieving and maintaining clean and healthy oceans by addressing the operation, recyclability, recovery and re-use of offshore electrolysers[5].
The following costs are considered to be eligible for funding: the design, development, procurement, integration and installation of the offshore electrolyser and its water supply; the electrolyser’s electricity connection; the auxiliary systems (including hydrogen storage and export infrastructure); the commissioning, operation and maintenance of the deployed system for the demonstration phase. Costs associated with offshore infrastructure acquisition or retrofitting, buying electricity and electricity grid levies for the demonstration phase are not eligible.
Applicants should be able to demonstrate the compatibility of their proposal with a wider perimeter, such as renewable electricity production, export/use means and/or platform infrastructure. Additional funding streams and match funding are encouraged.
This topic is expected to contribute to EU competitiveness and industrial leadership by supporting a European value chain for hydrogen and fuel cell systems and components.
Proposals should provide a preliminary draft on ‘hydrogen safety planning and management’ at the project level, which will be further updated during project implementation.
It is expected that Guarantees of origin (GOs) will be used to prove the renewable character of the hydrogen that is produced. In this respect consortium may seek out the issuance and subsequent cancellation of GOs from the relevant Member State issuing body and if that is not yet available the consortium may proceed with the issuance and cancellation of non-governmental certificates (e.g CertifHy[6]).
Activities developing test protocols and procedures for the performance and durability assessment of electrolysers and fuel cell components proposals should foresee a collaboration mechanism with JRC (see section 2.2.4.3 "Collaboration with JRC"), in order to support EU-wide harmonisation. Test activities should adopt the already published EU harmonised testing protocols to benchmark performance and quantify progress at programme level.
Activities are expected to start at TRL 5 and achieve TRL 7 by the end of the project.
At least one partner in the consortium must be a member of either Hydrogen Europe or Hydrogen Europe Research.
The conditions related to this topic are provided in the chapter 2.2.3.2 of the Clean Hydrogen JU 2022 Annual Work Plan and in the General Annexes to the Horizon Europe Work Programme 2021–2022 which apply mutatis mutandis.
[1]https://eur-lex.europa.eu/legal-content/EN/TXT/PDF/?uri=CELEX:52020DC0741&from=EN
[2]For definition of flagship see section 5.3. of the Clean Hydrogen JU Strategic Research and Innovation Agenda 2021 – 2027
[3]https://www.clean-hydrogen.europa.eu/projects-repository_en
[4]https://ec.europa.eu/energy/sites/ener/files/hydrogen_strategy.pdf
[6]https://www.certifhy.eu/
Eligibility & Conditions
General conditions
1. Admissibility conditions: described in Annex A and Annex E of the Horizon Europe Work Programme General Annexes
The page limit of the application is 70 pages.
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System
Additional condition: For all Innovation Actions the page limit of the applications are 70 pages.
2. Eligible countries: described in Annex B of the Work Programme General Annexes
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide.
3. Other eligibility conditions: described in Annex B of the Work Programme General Annexes
Additional eligibility condition: Maximum contribution per topic
For some topics, in line with the Clean Hydrogen JU SRIA, an additional eligibility criterion has been introduced to limit the Clean Hydrogen JU requested contribution mostly for actions performed at high TRL level, including demonstration in real operation environment and with important involvement from industrial stakeholders and/or end users such as public authorities. Such actions are expected to leverage co-funding as commitment from stakeholders. It is of added value that such leverage is shown through the private investment in these specific topics. Therefore, proposals requesting contributions above the amounts specified per each topic below will not be evaluated:
- HORIZON-JTI-CLEANH2-2022 -01-07 - The maximum Clean Hydrogen JU contribution that may be requested is EUR 9.00 million
- HORIZON-JTI-CLEANH2-2022 -03-03 - The maximum Clean Hydrogen JU contribution that may be requested is EUR 30.00 million
- HORIZON-JTI-CLEANH2-2022 -03-05 - The maximum Clean Hydrogen JU contribution that may be requested is EUR 15.00 million
- HORIZON-JTI-CLEANH2-2022 -04-01 - The maximum Clean Hydrogen JU contribution that may be requested is EUR 7.00 million
- HORIZON-JTI-CLEANH2-2022 -06-01 - The maximum Clean Hydrogen JU contribution that may be requested is EUR 25.00 million
- HORIZON-JTI-CLEANH2-2022 -06-02 - The maximum Clean Hydrogen JU contribution that may be requested is EUR 8.00 million
Additional eligibility condition: Membership to Hydrogen Europe/Hydrogen Europe Research
For some topics, in line with the Clean Hydrogen JU SRIA, an additional eligibility criterion has been introduced to ensure that one partner in the consortium is a member of either Hydrogen Europe or Hydrogen Europe Research. This concerns topics targeting actions for large-scale demonstrations, flagship projects and strategic research actions, where the industrial and research partners of the Clean Hydrogen JU are considered to play a key role in accelerating the commercialisation of hydrogen technologies by being closely linked to the Clean Hydrogen JU constituency, which could further ensure full alignment with the Strategic Research and Innovation Agenda of the Industry and the SRIA188 of the JU. This approach shall also ensure the continuity of the work performed within projects funded through the H2020 and FP7, by building up on their experience and consolidating the EU value-chain. This applies to the following topics:
- HORIZON-JTI-CLEANH2-2022 -01-07
- HORIZON-JTI-CLEANH2-2022 -01-08
- HORIZON-JTI-CLEANH2-2022 -01-10
- HORIZON-JTI-CLEANH2-2022 -02-08
- HORIZON-JTI-CLEANH2-2022 -03-03
- HORIZON-JTI-CLEANH2-2022 -03-05
- HORIZON-JTI-CLEANH2-2022 -04-01
- HORIZON-JTI-CLEANH2-2022 -06-01
- HORIZON-JTI-CLEANH2-2022 -06-02
- HORIZON-JTI-CLEANH2-2022 -07-01
Additional eligibility condition: Participation of African countries
For one topic the following additional eligibility criteria have been introduced to allow African countries to i) participate in proposal, ii) be eligible for funding and iii) ensure a sufficient geographical coverage of the African continent. This concerns the following topic:
- HORIZON-JTI-CLEANH2-2022 -05-5
Manufacturing Readiness Assessment
For some topics a definition of Manufacturing Readiness Level has been introduced in the Annexes of the Annual Work Programme. This is necessary to evaluate the status of the overall manufacturing activities included in the following topics:
- HORIZON-JTI-CLEANH2-2022 -01-04
- HORIZON-JTI-CLEANH2-2022 -04-01
The following additional eligibility criteria apply: At least one partner in the consortium must be a member of either Hydrogen Europe or Hydrogen Europe Research.
4. Financial and operational capacity and exclusion: described in Annex C of the Work Programme General Annexes
5. Evaluation and award:
- Award criteria, scoring and thresholds are described in Annex D of the Work Programme General Annexes
- Submission and evaluation processes are described in Annex F of the Work Programme General Annexes and the Online Manual
Exemption to evaluation procedure: complementarity of projects
For some topics in order to ensure a balanced portfolio covering complementary approaches, grants will be awarded to applications not only in order of ranking but at least also to one additional project that is / are complementary, provided that the applications attain all thresholds
- HORIZON-JTI-CLEANH2-2022 -01-03
- HORIZON-JTI-CLEANH2-2022 -01-04
- HORIZON-JTI-CLEANH2-2022 -01-09
- HORIZON-JTI-CLEANH2-2022 -02-10
- HORIZON-JTI-CLEANH2-2022 -03-01
- HORIZON-JTI-CLEANH2-2022 -03-02
- HORIZON-JTI-CLEANH2-2022 -03-04
- HORIZON-JTI-CLEANH2-2022 -04-04
Seal of Excellence
For two topics the ‘Seal of Excellence’ will be awarded to applications exceeding all of the evaluation thresholds set out in this Annual Work Programme but cannot be funded due to lack of budget available to the call. This will further improve the chances of good proposals, otherwise not selected, to find alternative funding in other Union programmes, including those managed by national or regional Managing Authorities. With prior authorisation from the applicant, the Clean Hydrogen JU may share information concerning the proposal and the evaluation with interested financing authorities, subject to the conclusion of confidentiality agreements. In this Annual Work Programme ‘Seal of Excellence’ will be piloted for topics:
- HORIZON-JTI-CLEANH2-2022 -06-01
- HORIZON-JTI-CLEANH2-2022 -06-02
- Indicative timeline for evaluation and grant agreement: described in Annex F of the Work Programme General Annexes
6. Legal and financial set-up of the grants: described in Annex G of the Work Programme General Annexes
In addition to the standard provisions, the following specific provisions in the model grant agreement will apply:
Intellectual Property Rights (IPR), background and results, access rights and rights of use (article 16 and Annex 5 of the Model Grant Agreement (MGA)).
- An additional information obligation has been introduced for topics including standardisation activities: ‘Beneficiaries must, up to 4 years after the end of the action, inform the granting authority if the results could reasonably be expected to contribute to European or international standards’. These concerns the topics below:
Additional information obligation for topics including standardisation activities
- HORIZON-JTI-CLEANH2-2022 -02-09
- HORIZON-JTI-CLEANH2-2022 -03-04
- HORIZON-JTI-CLEANH2-2022 -05-02
- HORIZON-JTI-CLEANH2-2022 -05-03
- HORIZON-JTI-CLEANH2-2022 -05-04
- For all topics in this Work Programme Clean Hydrogen JU shall have the right to object to transfers of ownership of results, or to grants of an exclusive licence regarding results, if: (a) the beneficiaries which generated the results have received Union funding; (b) the transfer or licensing is to a legal entity established in a non-associated third country; and (c) the transfer or licensing is not in line with Union interests. The grant agreement shall contain a provision in this respect.
Full capitalised costs for purchases of equipment, infrastructure or other assets purchased specifically for the action
For some topics, in line with the Clean Hydrogen JU SRIA, mostly large-scale demonstrators or flagship projects specific equipment, infrastructure or other assets purchased specifically for the action (or developed as part of the action tasks) can exceptionally be declared as full capitalised costs. This concerns the topics below:
- HORIZON-JTI-CLEANH2-2022 -01-07: electrolyser and other hydrogen related equipment essential for implementation of the project, (e.g. compression of hydrogen, storage and any essential end-use technology)
- HORIZON-JTI-CLEANH2-2022 -01-08: electrolyser, its BoP and any other hydrogen related equipment essential for the implementation of the project (e.g. hydrogen storage)
- HORIZON-JTI-CLEANH2-2022 -01-10: electrolyser, its BOP and any other hydrogen related equipment essential for implementation of the project (e.g. offshore infrastructure, renewable electricity supply infrastructure, storages, pipelines and other auxiliaries required to convey and utilise the hydrogen)
- HORIZON-JTI-CLEANH2-2022 -02-08: compression prototype/s and related components
- HORIZON-JTI-CLEANH2-2022 -03-03: trucks, fuel cell system, on-board hydrogen storage and other components needed in a hydrogen truck
- HORIZON-JTI-CLEANH2-2022 -03-05: vessels, fuel cell system, on-board hydrogen storage and other components needed in a hydrogen fuel cell hydrogen vessel
- HORIZON-JTI-CLEANH2-2022 -04-01: manufacturing equipment and tooling
- HORIZON-JTI-CLEANH2-2022 -06-01: hydrogen production plant, distribution and storage infrastructure and hydrogen end-uses
- HORIZON-JTI-CLEANH2-2022 -06-02: hydrogen production plant, distribution and storage infrastructure and hydrogen end-uses
Purchases of equipment, infrastructure or other assets used for the action must be declared as depreciation costs. However, for the following equipment, infrastructure or other assets purchased specifically for the action (or developed as part of the action tasks): electrolyser, its BOP and any other hydrogen related equipment essential for implementation of the project (e.g. offshore infrastructure, renewable electricity supply infrastructure, storages, pipelines and other auxiliaries required to convey and utilise the hydrogen), costs may exceptionally be declared as full capitalised costs.
Specific conditions
7. Specific conditions: described in the chapter 2.2.3.2 of the Clean Hydrogen JU 2022 Annual Work Plan
Documents
CALL UPDATE: FLASH CALL INFO
Call documents:
Application form — As well available in the Submission System from March 31st 2022
- Application form - Part B (HE CleanH2 RIA, IA)
- Application form - Part B (HE CleanH2 CSA)
Evaluation forms
- Evaluation form (HE RIA, IA)
Model Grant Agreement (MGA)
Clean Hydrogen JU - Annual Work Programme 2022 (AWP 2022)
- AWP 2022
Clean Hydrogen JU - Strategic Research and Innovation Agenda (SRIA)
Additional documents:
HE Main Work Programme 2021–2022 – 1. General Introduction
HE Main Work Programme 2021–2022 – 13. General Annexes
HE Framework Programme and Rules for Participation Regulation 2021/695
HE Specific Programme Decision 2021/764
Rules for Legal Entity Validation, LEAR Appointment and Financial Capacity Assessment
EU Grants AGA — Annotated Model Grant Agreement
Funding & Tenders Portal Online Manual
Support & Resources
Online Manual is your guide on the procedures from proposal submission to managing your grant.
Horizon Europe Programme Guide contains the detailed guidance to the structure, budget and political priorities of Horizon Europe.
Funding & Tenders Portal FAQ – find the answers to most frequently asked questions on submission of proposals, evaluation and grant management.
Research Enquiry Service – ask questions about any aspect of European research in general and the EU Research Framework Programmes in particular.
National Contact Points (NCPs) – get guidance, practical information and assistance on participation in Horizon Europe. There are also NCPs in many non-EU and non-associated countries (‘third-countries’).
Enterprise Europe Network – contact your EEN national contact for advice to businesses with special focus on SMEs. The support includes guidance on the EU research funding.
IT Helpdesk – contact the Funding & Tenders Portal IT helpdesk for questions such as forgotten passwords, access rights and roles, technical aspects of submission of proposals, etc.
European IPR Helpdesk assists you on intellectual property issues.
CEN-CENELEC Research Helpdesk and ETSI Research Helpdesk – the European Standards Organisations advise you how to tackle standardisation in your project proposal.
The European Charter for Researchers and the Code of Conduct for their recruitment – consult the general principles and requirements specifying the roles, responsibilities and entitlements of researchers, employers and funders of researchers.
Partner Search Services help you find a partner organisation for your proposal.
Latest Updates
No updates available.