Closed

Eu-rail – Sesar Synergy: Integrated Air And Rail Network Backbone For A Sustainable And Energy-efficient Multimodal Transport System

HORIZON JU Innovation Actions

Basic Information

Identifier
HORIZON-ER-JU-2023-FA1-SESAR
Programme
EU-RAIL JU Call Proposals 2023-01
Programme Period
2021 - 2027
Status
Closed (31094503)
Opening Date
October 4, 2023
Deadline
February 7, 2024
Deadline Model
single-stage
Budget
€2,800,000
Min Grant Amount
€2,800,000
Max Grant Amount
€2,800,000
Expected Number of Grants
1
Keywords
HORIZON-ER-JU-2023-FA1-SESARHORIZON-JU-ER-2023-01Air Traffic Management ATMMultimodalityRail OperationsRail Traffic Management

Description

Expected Outcome:

Project results are expected to contribute to the following outcomes:

  • Operational efficiency: improved predictability and punctuality for journeys involving both air and railway modes of transport, thanks to a better overall planning and monitoring of operations;
  • Capacity: a better integration of air and railway modes of transport will enable a better use of existing and future capacity e.g. by monitoring multimodal passenger flows information (e.g., status, demand, delays, etc.), share it to relevant stakeholders in air and railway modes e.g., transport service operators (TSPs) to take mitigation actions to help reducing potential delays;
  • Resilience: improved resilience in case of disruption in either railway or air transport modes, or both will contribute to improve the passenger experience;
  • Environment: optimised operations in rail and air transport due to improved intermodal planning, contributing to the optimisation of fuel-burn and therefore reductions of CO2 emissions per journey. Additional environmental benefits (i.e. emissions, noise and/or local air quality) will come from alleviating congestion at and around airports / railway stations by improving passenger flows (through multimodal decision making, etc.), from helping access/egress to/from airports / railway stations via environmentally-friendly means, etc.;
  • Passenger experience: optimised and seamless passenger experience by reducing the inefficiencies and friction points and overall travel time and transfer time between air-rail modes;
  • Cost-efficiency: the data-sharing-powered applications between air and railway modes of transport will enable increased predictability of traffic flows coupled with increased intermodal network flexibility and resilience. This would in turn help reduce congestion and costs.
Scope:

Aviation and railway are integral parts of the intermodal transport ecosystem expected to optimise door-to-door (D2D) mobility for people, and ultimately to meet citizens’ expectations for increasingly seamless mobility, where they can rely on the predictability of every planned door-to-door journey and can choose how to optimise it (shortest travel time, least cost, minimal environmental impact, etc.).

To successfully address the expected outcomes, and improve the attractiveness of combined air-rail travel for passengers, in a door-to-door context, the following research elements shall be delivered:

  • Benchmark on existing solutions of integrated rail and air traffic;
  • Integration of aviation and railway transport modes. Development of tools, digital platforms and services for a better integration of aviation and railway transport modes, as part of an intermodal transport ecosystem expected to optimise multimodal mobility. This shall include:
    • Definition of single, common and collaboratively-agreed intermodal (airport / railway) operations plan. The objective is to deliver a shared airport/railway operations plan including agreed performance indicators and objectives e.g. punctuality, and building on information from different players and stakeholders from the two modes of transportation. The connection to the Network Operations Plan (NOP) is expected to be done via the (Airport Operations Plan) AOP (airport part of the intermodality plan). The intermodal operation may include optimised timetables, luggage handling and passenger information, etc.;
    • Definition of the interface between the air traffic management systems (ATMS) (in particular regarding airport-rail connection) and the rail traffic management systems (TMS), both for planning purposes and operations, including disruptions;
    • Real-time information exchange services between aviation and railway giving stakeholders (including mobility providers) an increased knowledge of the multimodal journey and mobility providers the means to adapt and optimise traffic offers in the short term. This includes the elaboration of rationalised data-driven ATM/railway dashboards enabling stakeholders to have an up to date picture of the actual situation in both transport modes. These dashboards could be fed with key performance aviation and train indicators covering inter-modal management processes. These dashboards could also include predictive functionalities enabling stakeholders to proactively identify demand and capacity imbalances (location, duration, criticality, etc.), deviations compared to the shared plan, etc. This will enhance the reliability of multimodal journey planning, identifying as soon as possible potential access issues that could affect the punctuality of operations, and trigger the need for potential coordinated actions for alleviating congestion, mitigating regulatory constraints, optimising process, passengers journey management, etc.
    • ATM-airport-railway collaborative decision making process. This enables collaborative decision-making involving both air transport and railway transport stakeholders with the aim of facilitating a more efficient strategic and tactical planning and management of intermodal operations, passenger flows and enhancing passenger experience between the two modes of transportation. This research element covers:
      • The evolution of ATM related concepts developed within ATM boundaries e.g. airport operations plan (AOP), airport operations centre (APOC), airport collaborative decision making (A-CDM), total airport management (TAM), network operations plan (NOP), etc.;
      • The integration of data from aviation and railway transport information systems;
      • The development of an integrated capacity management process to ensure modal shift from feeder flights to railway;
      • The development of visualisation and decision support tools to allow the involved stakeholders to perform “what-if”, “what-else” analyses and assess the impact of different decisions / scenarios in order to determine the optimal course of action (this could make use of artificial intelligence and machine learning techniques).

Research may also address:

    • Post-operations analysis capabilities to allow both air and railway transport stakeholders to better plan operations and resources in the future aiming at a continuous improvement of intermodal operations;
    • Use of AI/ML to support the optimisation of the ATM-rail multimodal interface developing smart digital solutions to streamline the management of multimodal air-rail transport flows (e.g. AI/ML-powered demand-driven predictions of flights, trains, passengers and departure/arrival queues/sequences for improving operations efficiency and for service offer across air-rail modes accommodating as much door-to-door journeys as possible, etc.);
    • Business intelligence and machine learning to help intermodal stakeholders collaboration to align process and resource capacity with predicted demand to reduce queues.

(R&I need: An integrated transport network performance cockpit (from ATM SRIA))

  • An integrated aviation-railway transport network disruption and crisis management process. Enable the coordination – when managing disruption and crisis – between air and railway transport modes and a multitude of actors, including local and national authorities’ representatives. Research shall address the definition of the required data exchange for a situation of disruptions and crisis. The research should also lead to proposals for mitigation measures based on the timely acquisition and sharing of information, as well as it should consider a broad set of threats affecting, directly or indirectly, the intermodal system e.g. terrorism, volcanic ash dispersions, hazardous chemicals events, spread of diseases/pandemic, earthquakes, flooding, major failure of a pan-European function, (massive) cyberattack, etc. The proposal may include simulation scenarios to validate applicable use cases e.g. airport closure, rail strike, etc. (R&I needs: an integrated transport network crisis management process (from ATM SRIA) and incident and disruption management (from Rail strategic SRIA)

Additionally, the project to be funded under this topic shall:

  • Target maturity level is TRL6 and validation activities should be defined accordingly. In particular, activities including system, subsystems model/prototypes in a relevant end-to-end environment;
  • Propose a concept of operations (ConOPs) and high-level architecture of the proposed solution(s), further detail them into operational scenarios / use cases, leading to the definition and validation of requirements/specifications for data exchange, also in real-time, related to available capacity, disruptions, etc., and consequent respective airport operations - ATM – rail networks integration. Include a CBA for the proposed solutions ;
  • Consider the following potential scenarios:
    • City pairs from different EU Member States, which have both airports and high-speed train connections;
    • International airport hub connected to a high-speed railway station. This scenario may also consider other transport modes serving and/or connecting both the airport and railway station if applicable e.g. local / regional train operators, local bus lines, trams, metros, taxis etc.;
    • Regional rail line serving a smaller (regional) airport. This may also consider as well other transport modes.
  • Consider standards whenever possible, especially important with data sharing, integration of different transport modes, combination of ATMS and TMS and creation of new tools;
  • Take into consideration the following reference material:
    • The interfaces definition should consider:
      • From SESAR: European ATM Architecture (EATMA)[1] and the relevant links to elements in the ATM architecture (e.g. capabilities, systems);
      • From EU-Rail: Conceptual Data Model (CDM)[2], the work done within Shift2Rail TD2.9 [3]on TMS.
    • The EU Data Strategy which aims to create a Common European Mobility Data Space[4]. Please consider also the existing work of EU-Rail (Flagship Project 1 – MOTIONAL[5], Federated Data Spaces) for building a trusted, reliable, cybersecure federated data space for the rail ecosystem - the Rail Data Space. The Rail Data Space provides exchange and sharing of digital resources across Rail operators, Infrastructure Managers and Suppliers as a component in the creation of a Common European Mobility Data Space. It is compliant with the principles of the European Strategy for Data, e.g., Data Sovereignty, Data level playing field, public-private Governance and Decentralized soft infrastructure. Furthermore, it is interoperable with other sectorial data spaces;
    • State-of-the-art documentation on existing solutions on integrated rail and air traffic.
  • Involve relevant stakeholders from at least two EU Member States:
    • From the air sector perspective the proposals should foresee participation of, at least, airspace users (AUs) and airport operators;
    • From the rail sector perspective the proposals should foresee participation of, at least, High speed train operators, infrastructure managers and TMS operators, as well as regional/capillary line operators and TMS operators;
    • Research may include (if required) other stakeholders e.g. urban transport operators (metro, bus, etc.);
    • The inclusion of other modes of transport (e.g., UAM, cooperative, connected and automated mobility (CCAM), etc.) will be considered advantageous, in order to provide a full door-to-door experience validation.
  • Take into consideration the existing work developed within SESAR and EU-Rail (especially IP4 projects[6], Flagship Project 1 ) in terms of state-of-the-art of existing solutions, tools, algorithms and approaches (e.g. passenger flow, predictions and traffic modelling, total airport management concept, etc.);
  • Address data confidentiality e.g. GDPR aspects, as well as the approach on data sharing (including dataspaces tackled within EU-Rail project FP1-MOTIONAL);
  • Address (cyber)security and safety aspects of the proposed architecture in close collaboration with the System Pillar. Also, the availability and integration of external services able to supply data and information to the air and rail network management systems to improve air-rail intermodality shall be investigated;
  • Target a balanced participation of entities from both the rail and aviation sector. The contribution brought by those entities is also expected to be insofar as possible balanced between the rail and aviation stakeholders. The applicants can justify a different approach for the correct implementation of the action.

A joint execution framework is currently under development between SESAR 3 JU and Europe’s Rail JU. This common framework will provide more details on aspects related to the implementation of the proposal retained for funding, once the Grant Agreement is signed. It will be made available in the Question & Answers (Q&A) during the call for proposals submission period.

Interactions with other EU-RAIL and SESAR projects and EU-Missions

The action to be funded under this topic shall:

  • Take into account the state of play on multimodality, either completed or ongoing (under Horizon 2020/Horizon Europe programmes or beyond) activities that already tackle some of the aspects under this topic.
  • Collaborate with linked projects EU-RAIL Flagship Areas 1[5] and 6[8] and work together for any potential interfaces.
  • Collaborate and integrate the EU-Rail System Pillar[9] outputs related to concept of operations, Data Model, the Architecture and the interface with rail Traffic Management Systems.

Gender dimension

In this topic the integration of the gender dimension (sex and gender analysis) in research and innovation content is not a mandatory requirement.

[1] https://www.eatmportal.eu/working/signin

[2] https://projects.shift2rail.org/s2r_ipx_n.aspx?p=LINX4RAIL

[3] https://projects.shift2rail.org/s2r_ip_TD_r.aspx?ip=2&td=a86b26b5-2680-4765-9bc6-c935804d6aa6

[4] https://ec.europa.eu/info/law/better-regulation/have-your-say/initiatives/13566-Transport-data-creating-a-common-European-mobility-data-space-communication-_en

[5] https://projects.rail-research.europa.eu/eurail-fp1/

[6] https://projects.shift2rail.org/s2r_ip.aspx?ip=4

[7] https://projects.rail-research.europa.eu/eurail-fp1/

[8] https://projects.rail-research.europa.eu/eurail-fp6/

[9] https://rail-research.europa.eu/system_pillar/

Eligibility & Conditions

General conditions

The page limit of the application is as follows:

Regarding admissibility conditions and related requirements, part A of the Horizon Europe Work Programme 2023-2024 General Annexes applies, with the following exception: the limit for a full Innovation Action application is set to 70 pages.

General conditions

1. Admissibility conditions: described in Annex A and Annex E of the Horizon Europe Work Programme General Annexes

Proposal page limits and layout: described in Part B of the Application Form available in the Submission System

2. Eligible countries: described in Annex B of the Work Programme General Annexes

A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide.

3. Other eligibility conditions: described in Annex B of the Work Programme General Annexes

4. Financial and operational capacity and exclusion: described in Annex C of the Work Programme General Annexes

The granting authority can fund a maximum of one project.

  • Award criteria, scoring and thresholds are described in Annex D of the Work Programme General Annexes

The award criteria included in the General Annexes of the Horizon Europe – Work Programme 2023-2024 are complemented with additional criteria as specified in Annex VIII to this Work Programme.

  • Submission and evaluation processes are described in Annex F of the Work Programme General Annexes and the Online Manual

  • Indicative timeline for evaluation and grant agreement: described in Annex F of the Work Programme General Annexes

In addition, as specified in section 2.3.8.1 of the WP 2023-2024, and to facilitate contributions to considering the key contributing role of this topic, in designing the dissemination and communication activities, the proposal shall consider that the “Flagship Project” will be part of the overall EU-Rail Programme and the planning of key events – demonstrations, participations to fair, etc. – will be coordinated at Programme level and by the “Stakeholder Relations and Dissemination” structure of the JU.

The starting date of grants awarded under this topic may be as of the submission date of the application. Applicants must justify the need fora retroactive starting date in their application. Costs incurred from the starting date of the action may be considered eligible.

Eligible costs will take the form of a lump sum as defined in the Decision of 7 July 2021 authorising the use of lump sum contributions under the Horizon Europe Programme – the Framework Programme for Research and Innovation (2021-2027) – and in actions under the Research and Training Programme of the European Atomic Energy Community (2021-2025). [[This decision is available on the Funding and Tenders Portal, in the reference documents section for Horizon Europe, under ‘Simplified costs decisions’ or through this link: https://ec.europa.eu/info/funding-tenders/opportunities/docs/2021-2027/horizon/guidance/ls-decision_he_en.pdf]].

As specified in section 2.3.8.1 of the WP 2023-2024, in order to facilitate the contribution to the achievement of the EU-Rail objectives, the options regarding 'linked actions' of the EU-Rail Model Grant Agreement and the provisions therein, is enabled in the corresponding EU-Rail Grant Agreements.

The action that is expected to be funded under this topic will be complementary to the following actions:

• FP1-MOTIONAL (GA 101101973)

• FP6 – FutuRe (GA 101101962)

The action that is expected to be funded under this topic will be complementary to the following actions expected to be funder under the topic:

• HORIZON-SESAR-2022-DES-ER-01-WA1-5

• HORIZON-SESAR-2022-DES-ER-01-WA2-6

• HORIZON-SESAR-2022-DES-IR-01-WA5-3

Please note that the list is non-exhaustive as additional Linked Projects may follow at a later stage of the programme implementation to complement the activity.

6. Legal and financial set-up of the grants: described in Annex G of the Work Programme General Annexes

Specific conditions

7. Specific conditions: described in the [specific topic of the Work Programme]

 Applicant Private37 Members of the EU-Rail part of consortia responding to this topic should provide in-kind contributions to additional activities to be declared via the template model available on the F&T portal. The amount of total in-kind contributions (i.e. in-kind contributions for operational activities and in-kind contributions for additional activities) should be no less than 1.26338 times the funding request, in aggregate, of these applicant Private Members. Any discrepancy shall be well and duly justified.

In this respect, the grant agreements will set, in principle, annual deliverable on in-kind contributions for the projects selected under this topic, as well as mandatory reporting requirements, for those applicants who are Private Members of EU-Rail.

SESAR 3 JU members will report their IKOP and IKAA as per standard guidance, with no impact on the evaluation procedure.

Indicative project duration: 36 months. This does not preclude submission and selection of a proposal with a different project duration.

Special skills and/or capabilities expected from the Applicant(s): Applicants shall ensure that their proposals and consortium reflect the aggregated expertise to perform the activities and achieve the objectives set by the topic. The applicants are expected to gather expertise on rail Traffic Management Systems, Air Traffic Management systems and its architectures, rail and airport planning and operations, Artificial Intelligence for operation and planning, data exchange and Cybersecurity and other relevant related aspects and concepts. 

Contribution to the monitoring and implementation, standardisation, of the EU-Rail Programme: The action resulting from this topic is contributing the Flagship Area 1 and it is a contributor to the achievement of the objectives identified in the Master Plan [1] as further detailed in the Multi-Annual Work Programme [2] . In this respect, applicants are expected to deliver relevant information (data, results, etc.) as mutually agreed, to the JU and the Linked Project[s] to contribute to the advancement of the Innovation and System Pillars [3] activities, as well as in view of the development and implementation of EU policy and legislation (including Technical Specifications for Interoperability and Common Safety Methods) and the development of European standards. As specified in section 2.3.8.1 of the WP 2023-2024, and to facilitate contributions to European or international standards, the EU-Rail grant agreements will include an additional information obligation related to standards. Beneficiaries must inform EU-Rail (up to four years after the end of the action) if the results can be reasonably expected to contribute to European or international standards. As part of its internal control and management framework, the JU will perform series of reviews and maturity checkpoints to assess the overall progress against the project plan and against the performance and TRL targets. Depending on the outcome of these reviews and maturity checkpoints(s), the scope of the project may be revised and/or funding reduced in accordance with the provisions of the relevant grant agreement. Mitigation actions may be requested by the JU as condition for continued funding.

[1] Master Plan available at https://rail-research.europa.eu/wp-content/uploads/2022/03/EURAIL_Master-Plan.pdf

[2] MAWP available at https://rail-research.europa.eu/wp-content/uploads/2022/03/EURAIL_MAWP_final.pdf

[3] Refer to the https://rail-research.europa.eu/wp-content/uploads/2022/03/EURAIL_MAWP_final.pdf

 

Documents

Call documents:

Standard application form — call-specific application form is available in the Submission System from 4 October 2023

Evaluation form

Model Grant Agreement (ToMGA)

Europe's Rail - Work Programme 2022-2024

Europe's Rail - Master Plan

Europe's Rail - Multi Annual Work Programme

 

Support & Resources

 

EU-RAIL JU Call Helpdesk: [email protected]. Please note that the deadline for addressing queries related to EU-RAIL JU call for proposals to the Q&A functional mailbox ([email protected]) is Wednesday 24 January 2024 at 17:00 (Brussels Local Time).

Online Manual is your guide on the procedures from proposal submission to managing your grant.

Horizon Europe Programme Guide contains the detailed guidance to the structure, budget and political priorities of Horizon Europe.

Funding & Tenders Portal FAQ – find the answers to most frequently asked questions on submission of proposals, evaluation and grant management.

Research Enquiry Service – ask questions about any aspect of European research in general and the EU Research Framework Programmes in particular.

National Contact Points (NCPs) – get guidance, practical information and assistance on participation in Horizon Europe. There are also NCPs in many non-EU and non-associated countries (‘third-countries’).

Enterprise Europe Network – contact your EEN national contact for advice to businesses with special focus on SMEs. The support includes guidance on the EU research funding.

IT Helpdesk – contact the Funding & Tenders Portal IT helpdesk for questions such as forgotten passwords, access rights and roles, technical aspects of submission of proposals, etc.

European IPR Helpdesk assists you on intellectual property issues.

CEN-CENELEC Research Helpdesk and ETSI Research Helpdesk – the European Standards Organisations advise you how to tackle standardisation in your project proposal.  

The European Charter for Researchers and the Code of Conduct for their recruitment – consult the general principles and requirements specifying the roles, responsibilities and entitlements of researchers, employers and funders of researchers.

Partner Search Services help you find a partner organisation for your proposal.

 

Latest Updates

Last Changed: April 17, 2024

EU-Rail has completed the evaluation of the proposals submitted to the call HORIZON-JU-ER-2023-01. The results of the evaluation are as follows:

Number of proposals submitted: 24
Number of inadmissible proposals: 3
Number of ineligible proposals: 0
Number of below-threshold proposals: 5
Number of above-threshold proposals: 16



The applicants have been already informed about the evaluation results of their proposals.
It is expected that the grant agreements will be signed by July 2024.
 

 

Last Changed: April 17, 2024

EU-Rail has completed the evaluation of the proposals submitted to the call HORIZON-JU-ER-2023-01. The results of the evaluation are as follows:

Number of proposals submitted: 24
Number of inadmissible proposals: 3
Number of ineligible proposals: 0
Number of below-threshold proposals: 5
Number of above-threshold proposals: 16



The applicants have been already informed about the evaluation results of their proposals.
It is expected that the grant agreements will be signed by July 2024.

Last Changed: February 27, 2024

A total of 24 proposals were submitted to this call.

 

HORIZON-ER-JU-2023-ExplR-01: 4 proposals

HORIZON-ER-JU-2023-ExplR-02: 4 proposals

HORIZON-ER-JU-2023-ExplR-03: 3 proposals

HORIZON-ER-JU-2023-ExplR-04: 7 proposals

HORIZON-ER-JU-2023-ExplR-05: 2 proposals

HORIZON-ER-JU-2023-ExplR-06: 3 proposals

HORIZON-ER-JU-2022-FA7-01-SESAR: 1 proposal

 

The evaluation of the proposals will start in February 2024 and will be finalized in March 2024.

 

Applicants are expected to be informed about the outcome of the evaluations, indicatively, April 2024.

 

The successful proposals will go through the Grant Agreement Preparation (GAP) phase and the deadline for the Grant Agreement signature is scheduled for mid-2024.

 

Last Changed: February 20, 2024

 A total of 24 proposals were submitted to this call.


HORIZON-ER-JU-2023-ExplR-01: 4 proposals
HORIZON-ER-JU-2023-ExplR-02 : 4 proposals
HORIZON-ER-JU-2023-ExplR-03: 3 proposals
HORIZON-ER-JU-2023-ExplR-04: 7 proposals
HORIZON-ER-JU-2023-ExplR-05: 2 proposals
HORIZON-ER-JU-2023-ExplR-06: 3 proposals
HORIZON-ER-JU-2022-FA7-01-SESAR: 1 proposal







The evaluation of the proposals will start in February 2024 and will be finalized in March 2024.


Applicants are expected to be informed about the outcome of the evaluations, indicatively, April 2024.


The successful proposals will go through the Grant Agreement Preparation (GAP) phase and the deadline for the Grant Agreement signature is scheduled for mid-2024.

 

 

Last Changed: February 2, 2024

On 2 February 2024 a new release of the "Questions & Answers" document was published (Topic Conditions section: Additional Documents).

 

Last Changed: February 2, 2024

 

On 2 February 2024 a new release of the "Questions & Answers" document was published (Topic Conditions section: Additional Documents).

 

Last Changed: January 19, 2024

On 19 January 2024 a new release of the "Questions & Answers" document was published (Topic Conditions section: Additional Documents).

 

Last Changed: January 19, 2024

On 19 January 2024 a new release of the "Questions & Answers" document was published (Topic Conditions section: Additional Documents).

Last Changed: January 11, 2024

On 11 January 2024 a new release of the "Questions & Answers" document was published (Topic Conditions section: Additional Documents).

 

Last Changed: January 11, 2024

On 11 January 2024 a new release of the "Questions & Answers" document was published (Topic Conditions section: Additional Documents).

Last Changed: December 22, 2023

 

On 22 December 2023 a new release of the "Questions & Answers" document was published (Topic Conditions section: Additional Documents).

Last Changed: December 22, 2023

On 22December 2023 a new release of the "Questions & Answers" document was published (Topic Conditions section: Additional Documents).

 

Last Changed: December 15, 2023

 

On 15 December 2023 a new release of the "Questions & Answers" document was published (Topic Conditions section: Additional Documents).

 

Last Changed: December 15, 2023

 

On 15 December 2023 a new release of the "Questions & Answers" document was published (Topic Conditions section: Additional Documents).

 

Last Changed: December 4, 2023

On 4 December 2023 a new release of the "Questions & Answers" document was published (Topic Conditions section: Additional Documents).

Last Changed: December 4, 2023

On 4 December 2023 a new release of the "Questions & Answers" document was published (Topic Conditions section: Additional Documents).

Last Changed: November 27, 2023

On 27 November 2023 a new release of the "Questions & Answers" document was published (Topic Conditions section: Additional Documents).

Last Changed: November 27, 2023

On 27 November 2023 a new release of the "Questions & Answers" document was published (Topic Conditions section: Additional Documents).

Last Changed: November 13, 2023

On 13 November 2023 a new release of the "Questions & Answers" document was published (Topic Conditions section: Additional Documents).

Last Changed: November 13, 2023

On 13 November 2023 a new release of the "Questions & Answers" document was published (Topic Conditions section: Additional Documents).

Last Changed: October 25, 2023

On 25 October 2023 a new release of the "Questions & Answers" document was published (Topic Conditions section: Additional Documents).

Last Changed: October 25, 2023

 On 25 October 2023 a new release of the "Questions & Answers" document was published (Topic Conditions section: Additional Documents).

Last Changed: October 4, 2023
The submission session is now available for: HORIZON-ER-JU-2023-EXPLR-05(HORIZON-JU-RIA), HORIZON-ER-JU-2023-EXPLR-03(HORIZON-JU-CSA), HORIZON-ER-JU-2023-EXPLR-02(HORIZON-JU-RIA), HORIZON-ER-JU-2023-EXPLR-06(HORIZON-JU-CSA), HORIZON-ER-JU-2023-EXPLR-04(HORIZON-JU-RIA), HORIZON-ER-JU-2023-EXPLR-01(HORIZON-JU-RIA), HORIZON-ER-JU-2023-FA1-SESAR(HORIZON-JU-IA)
Eu-rail – Sesar Synergy: Integrated Air And Rail Network Backbone For A Sustainable And Energy-efficient Multimodal Transport System | Grantalist