Intelligent & Integrated asset management
HORIZON JU Innovation Actions
Basic Information
- Identifier
- HORIZON-ER-JU-2022-FA3-01
- Programme
- EU-RAIL JU Call Proposals 2022-01
- Programme Period
- 2021 - 2027
- Status
- Closed (31094503)
- Opening Date
- March 10, 2022
- Deadline
- June 23, 2022
- Deadline Model
- single-stage
- Budget
- €54,300,000
- Keywords
- Sustainable transportDigital AgendaRail projectsRail infrastructureRailwayRail TransportPrescriptive maintenanceDecision supportIoTAutonomous repairHolistic asset decisionData collectionData processingUnmanned InspectionRoboticsDigital twinsInfrastructureAssets management
Description
DESTINATION 3 – Intelligent & Integrated asset management
The financial and, to a certain extent, environmental costs associated with designing, building, constructing, operating, maintaining, and decommissioning rail drive also its capacity to compete and offer attractive services for the clients, passengers and supply chain. Therefore, rail asset management is a key area for research and innovation.
In the vision of the future rail asset management, assets status evolution information will be integrated with TMS (Traffic Management System) to improve services, reducing unavailability by limiting the impact of in-service failures and/or providing alternative solutions without cost impacts, and increasing safety. Moreover, the available information combined with AI (Artificial Intelligence) and digital twins will introduce intelligence to the management and optimize the overall life cycle and operation of the rail system.
The selected proposal for funding under this Destination will be a Flagship Project of Europe’s Rail with significant expected impacts, which require an integrated sector systemic approach. Proposals, should therefore set out a credible pathway (including an exploitation plan) to contributing to all of the following expected impacts as described in the Master Plan.
| Meeting evolving customer requirements | Reduced costs | More sustainable and resilient transport | Improved EU rail supply industry competitive-ness | Improved performance and capacity |
| |
These can be further detailed with specific impacts of this destination, as:
- Increase the volumes of rail transportation on existing lines
- Improve the cost-effectiveness of rail transportation on existing lines
- Reduce the CO2 emissions from the maintenance of existing lines
- Reduce the construction time and costs of new assets
- Increase in durability and reliability of assets
- Optimise life-cycle costs of assets
- Strengthen European rail industry competitiveness with more qualified products
- Improve Flexibility and punctuality of the railway system
Proposals under this Destination should set appropriate monitoring and demonstration activities to measure the following KPIs:
| # | Demonstrator Name | High level theme and result | KPI’s | |
| 1 | Asset Management & TMS | Integration of Intelligent Asset Management System (IAMS) & TMS |
| |
| 2 | Asset Management & Rolling Stock | Asset Management of Rolling Stock Operation, including specific solutions for freight |
| |
| 3 | Long Term Asset Management | Infrastructure & Rolling Stock long-term Asset Management |
| |
| 4 | Asset Management & Infrastructure | Asset Management of Infrastructure Operation |
| |
| 5 | Asset Management & Digital Twins | Digital Twin Asset Management, addressing both Rolling Stock & Infrastructure |
| |
| 6 | Design & Manufacturing | Advanced and Holistic Design |
| |
| 7 | Robotics & Interventions | Remotely controlled and unmanned interventions |
|
Expected Outcome:
To achieve the overall goal of this destination, five high-level capabilities have been identified, and the expected solutions should integrate the following:
Information sharing across the supply chain and TMS
The focus is on the ability to capture and share information securely across the entire rail system lifecycle, including operation, of rail assets. Furthermore, this area of action includes the secure exchange of information between the existing TMS [Results from Shift2Rail activities should be taken into account, see public deliverables of S2R TD2.9 (TMS) available here: WP6 deliverables: https://projects.shift2rail.org/s2r_ip2_n.aspx?p=X2RAIL-2] and the Intelligent Asset Management System [Results from Shift2Rail activities should be taken into account, see public deliverable of S2R TD3.6, TD3.7 and TD3.8 (IAMS) available here: IN2SMART-2 - D3.1 https://projects.shift2rail.org/download.aspx?id=1fc574ec-1a28-4199-b77b-402d352d62f0] (IAMS).
Unmanned and non-invasive monitoring and inspections
Building upon the work delivered by IP3 [public deliverables of S2R TD3.6, TD3.7 and TD3.8 (IAMS) available here:
IN2SMART (D9.1 ; D8.5 ; D7.4 ; D7.3 ; D7.2 ; D7.1 ; D4.1 ; D3.5): https://projects.shift2rail.org/s2r_ip3_n.aspx?p=IN2SMART MOMIT (D1.1 ; D1.2 ; D1.3; D2.1 ; D2.2 ; D3.1 ; D3.2 ; D4.1 ; D4.2): https://projects.shift2rail.org/s2r_ip3_n.aspx?p=MOMIT IN2DREAMS (D5.1; D5.3 ; D5.4): https://projects.shift2rail.org/s2r_ip3_n.aspx?p=S2R_IN2DREAMS ] in S2R and other research and innovation activities, the objective is to enhance the capability for automated and unmanned inspection and monitoring, evolving towards non-invasive and self-diagnostic systems with no or minimal service disruptions.
Advanced and holistic asset decisions
Building upon the work delivered by IP35 in S2R and other research and innovation, the focus is on the capability of making decisions in an advanced, automated, centralised, and holistic manner, considering the different assets, actors, standards, and regulations, especially combining track and rolling stock data. Furthermore, Digital Twins and enhanced visualisation techniques shall be exploited to support decision-making.
Advanced and holistic design and certification of assets (including virtual certification)
Building upon the work delivered by S2R [Public deliverables of S2R TD3.1 to 3.5 available here :IN2TRACK (D2.1 ; D2.2 ; D2.3 ; D3.1 ; D3.2 ; D3.3 ; D4.1): https://projects.shift2rail.org/s2r_ip3_n.aspx?p=IN2TRACK Public deliverable of CCA WA3.5 - Virtual Certification available here :PLASA2 – WP5: https://projects.shift2rail.org/s2r_ipcc_n.aspx?p=plasa-2] and other research and innovation, this outcome has a clear focus on the development of newly deployed components for the rail system with a LCC and system performance approach. Furthermore, in conjunction with the following capability, the use of additive manufacturing techniques shall be addressed, as well as the use of self-healing techniques and materials.
Remotely controlled and unmanned interventions
Building upon the work delivered by IP3 [Public deliverable of S2R TD3.8 (Lean Execution) available here:
IN2SMART – WP10: https://projects.shift2rail.org/s2r_ip3_n.aspx?p=IN2SMART] in S2R and other research and innovation, the objective is the development of capabilities for remote, automated, and unmanned intervention actions in rail systems. This shall make use of various technologies, including from other industries, such as robotics and wearable devices to support rail personnel, improve safety and increase the efficiency of intervention tasks.
The Flagship Project stemming from this topic should deliver, by 2025, innovative solutions to be demonstrated under the following high-level principles:
- The integration of the complete value chain.
- The exploitation of synergies between stakeholders at different levels, for instance, with respect to crossed monitoring.
- The prioritisation of activities to achieve 2030 European objectives in rail mobility, exploiting Shift2Rail results.
The demonstrators for innovative solutions shall have several operational differences to be covered, including:
- Climate. The proposed solutions shall have to be able to take into account the wide variety of European climate types.
- Line type. Demonstrators shall address high speed, conventional, regional, suburban and freight lines.
- Traffic type. Demonstrators shall cover passenger, freight and mixed lines.
- Asset type. Infrastructure and rolling stock shall be addressed jointly whenever possible considering all assets, including track, civil structures, earthworks, signalling, vehicles, track side, stations or power infrastructures.
- Planning level. demonstrators shall cover the Strategic Asset Management Plan level (SAMP), the Asset Management Plan level (AMP) and the Implementation of the Asset Management Plan level (IAMP).
The destination shall research, develop and deliver solutions that can be demonstrated by system approaches of the various developments targeting up to TRL 6 as European common integrated solutions. Due consideration should be given to certification and validation of the new technologies and processes as part of those demonstrators, that may be supported by several Use Cases:
- Asset Management & TMS. The main aim of the demonstrator shall be to show the integration between the Intelligent Asset Management System (IAMS) and the Traffic Management System (TMS) enabling the sharing of data and optimising decisions using common metrics – TRL6 by 2025.
- Asset Management & Rolling Stock. The main objective of this demonstrator shall be to present the monitoring of rolling stock (including on board and wayside technologies) leading to decisions and planning of interventions, and redirecting rolling stock to workshops to execute the (re)scheduled work both manually as well as by new technologies and solutions to conduct inspection tasks automatically – TRL6 by 2025..
- Long Term Asset Management. Development of Life Cycle Cost (LCC) models for infrastructure and rolling stock. This demonstrator shall include cross-border infrastructure remaining useful-life analysis and space-time cross-analysis and visualisation – TRL6 by 2025.
- Asset Management & Infrastructure. The objective shall be to integrate on field and on board systems with central platforms capable of managing Big Data to enable prescriptive interventions, minimising dangerous situations and service disruptions during operation – TRL6 by 2025.
- Asset Management & Digital Twins. The focus shall be on design, maintenance, upgrade and renewal interventions driven by Digital Twins for the optimisation of processes, maintenance planning and involved logistics. This shall enforce the use of BIM to standardise system configuration and AI tools to execute simulations and predictions. The Digital Twin demonstrator shall include visualisation, prediction and simulation – TRL7 by 2025.
- Design & Manufacturing. This demonstrator shall be the showcase of eco-friendly production of resilient assets supported by new fabrication techniques such as additive manufacturing (focussed on infrastructure assets) – TRL5 by 2025
- Robotics & Interventions. The focus of this demonstrator shall be the showcase of high-tech automated execution solutions for construction and interventions supported by robotics and wearables, among other devices, building a safer and more automated railway environment.- TRL5/6 by 2025
Each of these high-level demonstrators shall be further detailed and filled with specific, tangible and suitable use cases illustrating the impact of the technologies in concrete solutions. The choice of these use cases shall be based on sound business cases supported by a wide range of stakeholders possibly covering a wide range of assets proofing the versatility of the technologies, such as:
- Physical infrastructure: track, civil structures, earthworks, signalling, track side, stations or power infrastructures.
- Rolling stock: passenger service, freight and light/urban vehicles.
The business cases shall illustrate that major and widely recognised pain points are addressed ensuring that the wide deployment of the outcomes will contribute to a significant improvement in cost reduction, direct cost or LCC and/or reliability of the system or work conditions.
Where an opportunity would materialize to achieve more aggregated demonstrators, especially linking demonstrators in the area of asset management, in business cases that will link digital twins, TMS and asset management for rolling stock and/or infrastructure, this should be pursued.
The action to be funded under this Destination also needs to provide the following necessary elements for the demonstrations under the action to be funded under the Destination 5 – Sustainable Competitive Digital Green Rail Freight Services to be delivered for 2025 demonstrations: enabler 3 as described under the Scope section of this Destination. In addition of the above, the proposal shall cover important preparatory works needs to be launched for the future set of FA5 demonstration foreseen in the Multi- annual Work programme in view of the evolutions of the solutions, linked with the same enabler at higher TRL.
The action to be funded under this Destination also needs to be provide the following necessary elements for the demonstrations under the action to be funded under the Destination 1 – Network management planning and control & Mobility Management in a multimodal environment to be delivered for 2025 demonstrations: enabler 1 as described under the Scope section of this Destination. In addition of the above, the proposal shall cover important preparatory works needs to be launched for the future set of FA1 demonstration foreseen in the Multi- annual Work programme in view of the evolutions of the solutions, linked with the same enabler at higher TRL.
Scope:
The Flagship Project stemming from this topic shall develop under the following capabilities the enablers and any other which may contribute to deliver the aforementioned expected outcome:
Capability for Information sharing across the supply chain and TMS
Enabler 1: Scalable information platform to integrate and exchange information (e.g., asset health, maintenance planning, fleet operation, etc.) across the supply chain and TMS, requiring necessary management and sharing agreements between the involved actors at TRL6 in 2025, amongst others:
- secure standardised interfaces, methods, and processes for different data exchange (e.g., inspection devices to Asset Management Platform, etc.) at TRL6 in 2025, and
- high performance and/or edge computing solutions coupled with secure, wired, and wireless communication networks for information sharing at TRL6 in 2025.
Developments on all those enablers should also cover important preparatory works with higher TRL for the future set of demonstration foreseen in the Multi- annual Work programme in view of the evolutions of the solutions.
Capability for Unmanned and non-invasive monitoring and inspections
Enabler 2: Improved (in terms of cost reduction and/or better accuracy) asset diagnostic and inspection systems, as well as advanced, context aware, unmanned automated monitoring and inspections solutions at TRL6 in 2025, amongst others:
- AI and ML solutions and data fusion algorithms respectively to analyse and combine information provided by different inspection techniques at TRL6 in 2025;
- Secure standardised interfaces for different data exchange with precise time-stamping, synchronisation and accurate positioning solutions for data integrity at TRL6 in 2025; and
- energy-efficient inspection solutions with harvesting techniques and specific embedded wired and wireless communication networks at TRL6 in 2025;
More specifically, one Use Case shall address:
Enabler 3: Development of CBM methodologies and algorithms to be potentially exploited by the DAC based digital applications on CBM (TRL7) in 2025.
Developments on all those enablers should also cover important preparatory works with higher TRL for the future set of demonstration foreseen in the Multi- annual Work programme in view of the evolutions of the solutions.
Capability for Advanced and holistic asset decisions
Enabler4: New methodologies and technologies to leverage advanced and holistic asset decisions during the span of their life cycle at TRL6 in 2025, based on:
- probabilistic models for standardised railway asset LCC determination and for component failure in the asset maintenance decision strategy, at TRL6 in 2025
- operational and IoT data with additional rail system information and knowledge integrated with technologies to enable cooperative diagnostic between assets at TRL8 in 2025
- AI-based hybrid Decision Support based on predictive and prescriptive data analytics and Machine Learning algorithms for anomaly detection and failure prediction with optimised human-AI interactions at TRL6 in 2025
Enabler 5: Digital Twins integrated with BIM, GIS tools, and Virtual and Augmented Reality to enable agile visualization for different stakeholders of asset health status (historical, current, and forecasted) in various use cases at TRL 7 in 2025.
Developments on all those enablers should also cover important preparatory works with higher TRL for the future set of demonstration foreseen in the Multi- annual Work programme in view of the evolutions of the solutions.
Capability for Advanced and holistic design and certification of assets
Enabler 6: Advanced and holistic design and certification of assets, at TRL 5 in 2025, based on new ethical-by-design materials with advanced LCC characteristics, automated certification techniques (including virtual certification), and advanced embedded sensors for self-diagnostic materials.
Capability for Remotely controlled, unmanned and metadata-assisted interventions
Enabler 7: Development of remotely controlled, unmanned and metadata-assisted interventions in construction, maintenance, and renewal operations, based on:
-
- non-invasive or collaborative unmanned robotic actuators and wearables at TRL5 as well as vehicles based on AI and ML at TRL6 in 2025, and
- additive manufacturing techniques and validation standards for manufacturing and repairing assets at TRL 6 in 2025.
Developments on all those enablers should also cover important preparatory works with higher TRL for the future set of demonstration foreseen in the Multi- annual Work programme in view of the evolutions of the solutions.
The action shall actively contribute to measure and monitor the specific quantitative KPIs defined in the Destination description above, including its contribution to the Europe’s Rail Master Plan impacts.
The action shall actively contribute to the EU-Rail standardisation rolling development plans wherever relevant. Similarly, the action shall contribute to the development and implementation of EU policy and legislation including Technical Specifications for Interoperability and Common Safety Methods, as well as to publications of the System Pillar.
Collaboration work required with other FAs
The action to be funded under Destination 3 shall foresee a common activity/task related to capturing specific requirements and review of specifications relevant to the actions to be funded under Destination 1 and 5.
Interaction with the System Pillar
The System Pillar aims to guide, support and secure the work of the Innovation Pillar (i.e. to ensure that research is targeted on commonly agreed and shared customer requirements and operational needs, compatible and aligned to the system architecture), and the Innovation Pillar will impact the scope of the System Pillar where new technologies or processes mean that innovations can drive a change in approach, as well as delivering detailed specifications and requirements.
In this respect, the necessary resources would have to be dedicated to areas linked to System Pillar conceptual and architecture works – particularly addressing specification development (the interaction is illustrated in the System Pillar – Innovation Pillar interaction note (Annex VI of this Work Programme). The alignment of the activities will primarily take place during the Grant Preparation Phase and ramp up phase of the awarded proposal, and there will be continued interaction through the life of the project.
Gender dimension
In this topic the integration of the gender dimension (sex and gender analysis) in research and innovation content is not a mandatory requirement.
Specific Topic Conditions:Activities are expected to achieve a minimum between TRL 5 and TRL 8, depending on the enabler addressed, or higher by the end of the project – see General Annex B for a guide to the TRL definitions and criteria to be used.
Cross-cutting Priorities:Digital Agenda
Eligibility & Conditions
General conditions
1. Admissibility conditions: described in Annex A and Annex E of the Horizon Europe Work Programme General Annexes
The page limit of the application is as follows:
Regarding admissibility conditions and related requirements, part A of the Horizon Europe Work Programme 2021-2022 General Annexes applies with the following exception: the limit for a full Innovation Action application is set to 120 pages.
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System
2. Eligible countries: described in Annex B of the Work Programme General Annexes
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide.
3. Other eligibility conditions: described in Annex B of the Work Programme General Annexes
4. Financial and operational capacity and exclusion: described in Annex C of the Work Programme General Annexes
5. Evaluation and award:
- Award criteria, scoring and thresholds are described in Annex D of the Work Programme General Annexes
The award criteria included in the General Annexes of the Horizon Europe – Work Programme 2021 – 2022 are complemented with additional criteria as specified in Annexe 8 of this Work Programme.
- Submission and evaluation processes are described in Annex F of the Work Programme General Annexes and the Online Manual
The granting authority can fund a maximum of one project.
- Indicative timeline for evaluation and grant agreement: described in Annex F of the Work Programme General Annexes
6. Legal and financial set-up of the grants: described in Annex G of the Work Programme General Annexes
Eligible costs will take the form of a lump sum as defined in the Decision of 7 July 2021 authorising the use of lump sum contributions under the Horizon Europe Programme – the Framework Programme for Research and Innovation (2021-2027) – and in actions under the Research and Training Programme of the European Atomic Energy Community (2021-2025). [[This decision is available on the Funding and Tenders Portal, in the reference documents section for Horizon Europe, under ‘Simplified costs decisions’ or through this link: https://ec.europa.eu/info/funding-tenders/opportunities/docs/2021-2027/horizon/guidance/ls-decision_he_en.pdf]].
Grants awarded under this topic will be linked to the following action(s):
As specified in section 2.3.3.2 of the AWP 2022, in order to facilitate the contribution to the achievement of the EU-Rail JU objectives, the options regarding 'linked actions' of the EU-Rail Model Grant Agreement and the provisions therein, is enabled in the corresponding EU-Rail JU Grant Agreements.
The action that is expected to be funded under this topic will be complementary to the actions that are expected to be funded under the following topics:
- HORIZON-ER-JU -2022-FA1-01: Network management planning and control & Mobility Management in a multimodal environment and Digital Enablers
- HORIZON-ER-JU -2022-FA2-01: Digital & Automatic up to Automated Train Operations
- HORIZON-ER-JU -2022-FA4-01: A sustainable and green rail system
- HORIZON-ER-JU -2022-FA5-01: Sustainable Competitive Digital Green Rail Freight Services
- HORIZON-ER-JU -2022-FA6-01: Regional rail services / Innovative rail services to revitalise capillary lines
Please note that the list non-exhaustive as additional Linked Projects may follow at a later stage of the programme implementation to complement the activity.
In addition, as specified in section 2.3.3.2 of the AWP 2022 of Europe's Rail Joint Undertaking, and to facilitate contributions to considering the key contributing role of this topic, in designing the dissemination and communication activities, the proposal shall consider that the “Flagship Project” will be part of the overall EU-Rail Programme and the planning of key events – demonstrations, participations to fair, etc. – will be coordinated at Programme level and by the “Stakeholder Relations and Dissemination” structure of the JU.
The funding rate of the action is 60% of the eligible costs to achieve the leverage effect established in the SBA. Each Consortia may decide internally different funding rates in line with the provisions of Article 34 of Horizon Europe nevertheless complying with the overall funding rate of 60%.
The starting date of grants awarded under this topic may be as of the submission date of the application. Applicants must justify the need for a retroactive starting date in their application. Costs incurred from the starting date of the action may be considered eligible.
Specific conditions
7. Specific conditions: described in the [specific topic of the Work Programme]
Applicant Private [As defined in Article 2(5) of Council Regulation (EU) 2021/2085.] Members of the EU-Rail JU part of consortia responding to this topic should provide in-kind contributions to additional activities to be declared via the template model available on the F&T portal. The amount of total in-kind contributions (i.e. in-kind contributions for operational activities and in-kind contributions for additional activities) should be no less than 1.263 [In order to support a leverage factor of no less than the ratio between the contribution from members other than the Union and the Union financial contribution, as on the basis of Articles 88 and 89 of Council Regulation (EU) 2021/2085] times the funding request, in aggregate, of these applicant Private Members. Any discrepancy shall be well and duly justified.
In this respect, the grant agreements will set, in principle, annual deliverables, in pr on in-kind contributions for the projects selected under this topic, as well as mandatory reporting requirements, for those applicants who are Private Members of the EU-Rail JU.
The indicative project duration is: 48 months
Special skills and/or capabilities expected from the Applicant(s)
Applicants shall ensure that their proposals and consortium reflect the aggregated expertise to perform the activities and achieve the objectives set by the Destination:
- Expertise from rail infrastructure managers and railway undertakings, which should allow
- defining main challenges, use cases and functional needs,
- specifying, prioritizing and clustering demonstrators to ensure that researched innovative processes, operational and technological solutions are covered,
- hosting the demonstrations and providing test trains/facilities,
- providing data structures and content as well as processes, e.g. certification which can be subject for digitalisation.
- Expertise from rail suppliers (system integrators, manufacturers and/or technology providers), which should allow, jointly,
- proposing operational and technological innovative solutions to identified use cases and functional needs,
- identifying the technical requirements and interface specifications, aligned with the System Pillar architecture,
- designing, developing, prototyping and delivering innovative operational & technological solutions and systems to be integrated within the demonstrations, depending on the specific target TRL level.
- Expertise from research institutes and academia, which should allow
- planning, developing, studying, testing and evaluating solutions, systems and demonstrators together with the previous categories of expertise,
- supporting any possible scientific or methodological issues that may arise during the performance of the action
- contributing to other aspects of the innovation cycle, as well as to the procedural aspects for validation, certification, etc.
- Complementary expertise from other sectors and parties, with particular attention to SMEs and Start-ups, which may contribute to enhance the actions’ outcome.
Contribution to the monitoring and implementation, standardisation, of the EU-Rail Programme
The action resulting from this topic is identified as a “flagship project” expected to perform, by the completion of the research and innovation lifecycle, “large scale demonstrations”, in the meaning of Council Regulation (EU) 2021/2085. Hence, the action is a key contributor to the achievement of the objectives identified in the Master Plan Master Plan available at[ https://shift2rail.org/about-europes-rail/europes-rail-reference-documents/europes-rail-key-documents/ ] as further detailed in the Multi-Annual Work Programme [MAWP available at https://shift2rail.org/about-europes-rail/europes-rail-reference-documents/europes-rail-key-documents/.]
In this respect, applicants are expected to deliver relevant information (data, results, etc.) as mutually agreed, to the JU and the Linked Project[s] to contribute to the advancement of the Innovation and System Pillars [Refer to the Multi-Annual Work Programme available at https://shift2rail.org/about-europes-rail/europes-rail-reference-documents/europes-rail-key-documents/] activities, as well as in view of the development and implementation of EU policy and legislation (including Technical Specifications for Interoperability and Common Safety Methods) and the development of European standards. As specified in section 2.3.3.2 of the AWP 2022, and to facilitate contributions to European or international standards, the EU-Rail grant agreements will include an additional information obligation related to standards. Beneficiaries must inform the EU-Rail JU (up to four years after the end of the action) if the results can be reasonably expected to contribute to European or international standards.
As part of its internal control and management framework, the JU will perform a of reviews and maturity checkpoints to assess the overall progress against the project plan and against the performance and TRL targets. Depending on the outcome of these reviews and maturity checkpoints(s), the scope of the project may be revised and/or funding reduced in accordance with the provisions of the relevant grant agreement. Mitigation actions may be requested by the JU as condition for continued funding.
The proposal shall consider the necessary resources – FTE and/or other – to ensure the monitoring of the “Flagship Project” via regular reporting, reporting of data for the Programme KPIs, etc.. A EU-Rail Governance and Process Handbook is available here:https://shift2rail.org/participate/
Documents
Call documents:
Application form — As well available in the Submission System from 10 March 2022
Evaluation form
Model Grant Agreement (ToMGA)
Europe's Rail - Work Programme 2022-2024
Europe's Rail - Master Plan
Europe's Rail - Multi Annual Work Programme
Additional documents:
HE Main Work Programme 2021–2022 – 1. General Introduction
HE Main Work Programme 2021–2022 – 13. General Annexes
HE Framework Programme and Rules for Participation Regulation 2021/695
HE Specific Programme Decision 2021/764
Rules for Legal Entity Validation, LEAR Appointment and Financial Capacity Assessment
EU Grants AGA — Annotated Model Grant Agreement
Funding & Tenders Portal Online Manual
Funding & Tenders Portal Terms and Conditions
Funding & Tenders Portal Privacy Statement
Questions & Answers Release 1: 22 March 2022
Questions & Answers Release 2: 31st March 2022
Questions & Answers Release 3: 20 April 2022
Questions & Answers Release 4: 02 May 2022
Questions & Answers Release 5: 11 May 2022
Questions & Answers Release 6: 16 May 2022
Support & Resources
EU-RAIL JU Call Helpdesk: [email protected]. Please note that the deadline for addressing queries related to EU-RAIL JU call for proposals to the Q&A functional mailbox ([email protected]) is Thursday 09 June 2022 at 17:00 (Brussels Local Time).
Given the required interaction by this topic with the EU-Rail System Pillar activities, applicants to this call topic have the possibility to interact with the team contracted by EU-Rail and the European Commission to support the ramp up phase of the System Pillar initial actions, through this functional mailbox: [email protected]
Please note that all call for proposals related questions shall be addressed only to the EU-Rail JU call helpdesk, as previously indicated ([email protected]). The deadline for addressing queries to both these functional mailboxes is Thursday 09 June 2022 at 17:00 (Brussels Local Time).
Online Manual is your guide on the procedures from proposal submission to managing your grant.
Horizon Europe Programme Guide contains the detailed guidance to the structure, budget and political priorities of Horizon Europe.
Funding & Tenders Portal FAQ – find the answers to most frequently asked questions on submission of proposals, evaluation and grant management.
Research Enquiry Service – ask questions about any aspect of European research in general and the EU Research Framework Programmes in particular.
National Contact Points (NCPs) – get guidance, practical information and assistance on participation in Horizon Europe. There are also NCPs in many non-EU and non-associated countries (‘third-countries’).
Enterprise Europe Network – contact your EEN national contact for advice to businesses with special focus on SMEs. The support includes guidance on the EU research funding.
IT Helpdesk – contact the Funding & Tenders Portal IT helpdesk for questions such as forgotten passwords, access rights and roles, technical aspects of submission of proposals, etc.
European IPR Helpdesk assists you on intellectual property issues.
CEN-CENELEC Research Helpdesk and ETSI Research Helpdesk – the European Standards Organisations advise you how to tackle standardisation in your project proposal.
The European Charter for Researchers and the Code of Conduct for their recruitment – consult the general principles and requirements specifying the roles, responsibilities and entitlements of researchers, employers and funders of researchers.
Partner Search Services help you find a partner organisation for your proposal.
Latest Updates
On 10 June 2022 a new release of the "Questions & Answers" document was published (Topic Conditions section: Additional Documents).
On 24 May 2022 a new release of the "Questions & Answers" document was published (Topic Conditions section: Additional Documents).
On 11 May 2022 a new release of the "Questions & Answers" document was published (Topic Conditions section: Additional Documents).
On 02 May 2022 a new release of the "Questions & Answers" document was published (Topic Conditions section: Additional Documents).
On 20 April 2022 a new release of the "Questions & Answers" document was published (Topic Conditions section: Additional Documents).
On 31st March 2022 a new release of the "Questions & Answers" document was published (Topic Conditions section: Additional Documents).
On 22 March 2022 a new release of the "Questions & Answers" document was published (Topic Conditions section: Additional Documents)