Closed

Next generation electrical energy storage for military forward operation bases

EDF Research Actions

Basic Information

Identifier
EDF-2021-ENERENV-D-NGES
Programme
Energy efficiency and energy management
Programme Period
2021 - 2027
Status
Closed (31094503)
Opening Date
September 8, 2021
Deadline
December 8, 2021
Deadline Model
single-stage
Budget
€133,000,000
Min Grant Amount
Max Grant Amount
Expected Number of Grants
Keywords
EDF-2021-ENERENV-D-NGESEDF-2021-ENERENV-D

Description

Expected Impact:

At strategic level:

- Enhance force protection.

- Reduce the logistic needs of camps.

- Reduce the carbon footprints of military missions and hence tackle the climate change in line with the Union's policies.

- Reduce the direct cost of military missions.

- Enhance the interoperability of EU Member States’ armed forces.

- Reduce European dependency on critical raw materials for energy storage systems.

At mission level:

- Improve situational awareness, resilience and security of EU operations.

- Reduce the logistic needs of camps.

- Enable the increase of renewable energy generation in FOBs by maintaining distribution capacity and power quality.

- Reduction of hazardous materials from Energy Storage devices components.

Objective:

Electrical power for Forward Operating Bases has been produced mainly by diesel gensets for decades. Gensets have been seen as a reliable, stable and easy to deploy power source for FOBs and other deployable infrastructure for decades. Nevertheless, a combined momentum for increase of energy consumption during operations, reduction of GHG emissions, concerns about logistical routes safety in long-term international operations and the increase of cost and difficulty of access to fossil fuels lead to a required change of future electrical power supply in FOBs. Considering the technological trends in the energy sector, future FOBs will probably require the use of smart grids combining diesel generators with renewables supported by storage systems.

Specific challenge

The specific challenge of this topic is to assess the current energy storage systems that are developed for civil use and that might be used at a military level. Nevertheless, several factors as lack of European leadership in the technologies, scarcity of resources and geopolitical issues are leading to a European strategy to develop alternative technologies to achieve more sustainable, safer and cost-efficient energy storage systems. In addition, a supplementary effort on these alternative technologies should be made to assure that they are adapted to a deployable, more severe military environment subject to different geographical locations, weather and climate conditions (including extreme environments).

Scope:

The proposal must address the development of an application-oriented analysis, including a draft guideline recommendation for novel energy storage technologies is safer and usable for military deployments in forward operation bases; and achieve validation in relevant environment.

Additionally, a set of military requirements (including but not limited to application specific duty-cycles, loading cycles, storage and tactical and environmental conditions) must be collected, aligned and analysed to derive design targets for future energy storage system(s). The proposal will comprehend both components and system integration analysis.

These requirements will then be transferred into a guideline recommendation for the energy storage systems and their integration to be used as a basis for the creation of standards and requirement specifications for procurement procedures. An evaluation of the availability of different energy storage alternatives within the industry and from reliable sources must be made. Additionally, tests of a representative application-specific energy storage system will be carried out for validation of these requirements with the aim to create a European platform for the implementation of these systems.

Targeted activities

The proposals must cover the following activities as referred in article 10.3 of the EDF Regulation, not excluding possible upstream and downstream activities eligible for development actions if deemed useful to reach the objectives:

- Studies, such as feasibility studies to explore the feasibility of new or improved technologies, products, processes, services and solutions.

- The design of a defence product, tangible or intangible component or technology as well as the definition of the technical specifications on which such design has been developed which may include partial tests for risk reduction in an industrial or representative environment.

The proposals must address in particular the following objectives:

Studies:

- Analysis of civil-developing novel energy storage technologies and their suitability for deployable, stationary-use applications as FOBs.

- Compilation of specific military requirements for energy storage systems from Member States including the energy and power densities, low maintenance and cost comparison.

- Review safety requirements, military interoperability issues and operational aspects.

- Assess European research, development and industrial capabilities on this area to fulfil future military needs.

Design:
“Based on the requirements derived from the feasibility study, and in compliance with them”

- Design of a functional technological demonstrator based on the novel energy storage technologies identified, both at component and system level.

- Building of the technology demonstrator to de-risk suitable energy storage technologies and their combinations in hybrid systems to achieve functional requirements, including development of advanced software and hardware for power and energy storage management (like Battery management system –BMS) and validation in relevant environment.

Functional requirements

The proposed solutions should fulfil the following requirements:

General:

- Compliance with safety and risk requirements addressing its whole lifecycle.

- Compliance with applicable standardisation requirements for energy storage systems design and military interoperability.

Logistics and deployment:

- Integration in military standard 20-feet containers.

- The system must be capable of maintaining its performance after long storage time in a military infrastructure, with minimum maintenance and cost levels.

- The system must be safe and ready for transportation on military conditions, including aerial deployment.

- The system must be easily deployable and recoverable.

Operational conditions:

- The system must have high energy density.

- The system must be capable of short charging and discharging cycles while keeping its performance.

- The system must have reduced noise and electromagnetic signatures.

- The system must be capable of performing in severe environmental conditions including use in extreme climatic or sensitive environments.

- The system must have a long lifetime (both in high number of cycles and calendar life).

- The system must be ready for smart hot plug in and out ability of elements and complying with standardization of interfaces for EU Member States.

- The system must present high level of operational autonomy and reduced maintenance.

Eligibility & Conditions

Conditions

1. Admissibility conditions: described in section 3 of the call document

Proposal page limits and layout:  64 pages for Section 6 + Section 7 of Part B of the Submission form; 2 pages per work package for Section 8 of Part B of the Submission form. Layout conditions as described in the Notice of Part B of the Submission form

-       

2. Eligible countries: described in section 3 of the call document  

3. Other eligibility conditions: described in section 3 of the call document

4. Financial and operational capacity and exclusion: described in section 3 of the call document

Submission and evaluation processes: described section 3 of the call document and the Online Manual

Award criteria, scoring and thresholds: described in section 3 of the call document

Indicative timeline for evaluation and grant agreement: described in section 3 of the call document  

6. Legal and financial set-up of the grants: described in section 3 of the call document  

 

Call documents:

The following documents can be found at this link:

 -          Calls and conditions

o   EDF 2021 call texts and conditions for the calls

 -          Submission forms*

o   Part A: Standard application form (EDF)

o   Part A sup: Supplementary application form (EDF)

o   Part B: Description of the action (EDF)

o   Annex 1 & 2 - Budget tables

o   Appendix to Annex 1 & 2, including a correspondence table for applicants and affiliated entities opting for actual indirect costs

o   Annex 3 - Declaration of honour (DoH) applicants and affiliated entities

o   Annex 4 - IPR on background information

o   Annex 5 - Industry related information

o   Annex 6 -  Declaration of ownership and control

o   Annex 7 - Operational capacity and resources

o   Annex 8 -  Mid-cap self-assessment form

 * Final submission forms will be available directly on the submission module in the Funding and Tenders Portal once the calls are open (9 September)

-          Guide for applicants

o   EDF Guide for applicants

o   Guidance on How to complete your Ethics self-assessment 

 

 

Additional documents:

 -          Model grant agreements

o   EDF actual cost MGA (coming soon)

o   EDF lump sum MGA (coming soon)

 -          Security

o   EDF Programme Security Instruction (PSI) (coming soon)

 -          Regulations

o    EDF Regulation 2021/697

o  EU Financial Regulation 2018/1046 

 

-          Work programmes

o    EDF Work Programme 2021

o   EDF Work Programme 2022-part 1

 

-         Rules for Legal Entity Validation, LEAR Appointment and Financial Capacity Assessment 

-         Funding & Tenders Portal Online Manual 

-         Funding & Tenders Portal Terms and Conditions 

-         Funding & Tenders Portal Privacy Statement

 

Support & Resources

For help related to this call, please contact: [email protected]

Funding & Tenders Portal FAQ – Submission of proposals.

IT Helpdesk – Contact the IT helpdesk for questions such as forgotten passwords, access rights and roles, technical aspects of submission of proposals, etc.

Online Manual – Step-by-step online guide through the Portal processes from proposal preparation and submission to reporting on your on-going project. Valid for all 2021-2027 programmes.

Latest Updates

Last Changed: December 6, 2021

 

Please make sure that you have checked the latest version of the EDF FAQ available here.

In order to cope with the 100 MB size limit we recommend that all pdf files are generated with the highest possible compression rate compliant with readable content.

If the proposal size remains above the 100 MB limit after achieving the highest compression, the applicants, affiliated entities and subcontractors involved in the action are given the opportunity to upload individually on their Participant’s page on the Funding & Tender Opportunities portal specific supporting documents that are requested as part of the submission of the proposal.

This possibility to upload document on the their Participant’s page on the Funding & Tender Opportunities portal is strongly conditioned to the following elements:

-       the type of document that can be uploaded is exclusively limited to the documents that should otherwise be attached to Annex 6 – Declaration of Ownership and Control (e.g. minutes of shareholders meetings, documents related to ownership structure or corporate governance);

-       the documents shall be uploaded individually by the entities on their own Participant account (i.e. own PIC – no grouping of multiple entities’ documents under a single PIC) before the submission deadline as indicated on the Call Page on the Funding & Tender Portal;

-       the documents shall be uploaded via the Document section in the PIC account/Add new document/under type “Other”;

-       the documents shall not include ID documents of individuals.

If you revert to this possibility for several documents to be normally attached to Annex 6, please indicate it in Annex 6 by checking the box in column P for the corresponding attachments and by adding in column R the name of the corresponding file followed by “provided on the participant’s page”.

To access the participant’s portal, click on “Login” on the top right hand side of any page of the Funding & tenders (europa.eu). Then access to the right page via: “My Organisation(s)” then “Actions” then “Modify Organisation”. Then in the “Documents” tab then “Add new document”. Upload your document(s) and indicate “other” in “Document type”.

 

If the solution proposed above does not solve the size issue, please revert to us using the following email address: [email protected]


Last Changed: November 16, 2021

EDF Model Grant Agreements for Lump Sum and actual costs grants are now available in the section Reference documents of the Funding & Tender Portal.

Last Changed: November 16, 2021

EDF Model Grant Agreements for Lump Sum and actual costs grants are now available in the section Reference documents of the Funding & Tender Portal.

 

Last Changed: September 10, 2021
The submission session is now available for: EDF-2021-ENERENV-D-EEMC(EDF-2021), EDF-2021-ENERENV-D-NGES(EDF-2021), EDF-2021-ENERENV-D-PES(EDF-2021)
Last Changed: July 22, 2021

EDF Guide for applicants now available here, as well as revised versions of previously published documents!

Last Changed: July 6, 2021

2021 calls for proposals and conditions for the calls as well as Submission form templates are available here since 5 July afternoon.

Next generation electrical energy storage for military forward operation bases | Grantalist