Closed

Rail – studies, works or mixed

CEF Infrastructure Projects

Basic Information

Identifier
CEF-T-2024-COMPCOEN-RAIL-WORKS
Programme
CEF 2 Transport - Projects on the Comprehensive Network - Cohesion envelope
Programme Period
2021 - 2027
Status
Closed (31094503)
Opening Date
September 24, 2024
Deadline
January 21, 2025
Deadline Model
single-stage
Budget
€150,000,000
Min Grant Amount
Max Grant Amount
Expected Number of Grants
Keywords
CEF-T-2024-COMPCOEN-RAIL-WORKSCEF-T-2024-COMPCOEN

Description

Objective:

The objective is to develop rail transport infrastructure projects on the TEN-T comprehensive network.

Scope:

Studies and / or works related to:

  • construction/upgrading of cross-border and missing links;
  • capacity and performance upgrade of existing lines, including removal of level-crossings and upgrades necessary for 740 meter long trains and upgrades necessary to facilitate international rail passenger and freight transport;
  • capacity increase in nodes, including as regards a better articulation of long-distance and local traffic;
  • interconnections between rail and other modes of transport, in particular inland waterway and maritime transport and projects aimed at the integration of the rail and air networks to make the feeder network for long-haul flights more sustainable. Projects located exclusively within the perimeter of inland ports and maritime ports must be submitted under those priorities respectively;
  • connections of freight terminals to the TEN-T network, including the construction/upgrade of the railway infrastructure component of the terminals;
  • electrification of line tracks and upgrade/construction of electrification systems.

Support will not be given to railway stations, except for railway infrastructure components. If the project includes such components, they should be presented as a separate work package. Support will not be given to activities related to the Class B systems nor to rolling stock.

Support to track side ERTMS deployment, electronic interlockings and/or Class A radio communication (5G/FRMCS/GSM-R) components will only be granted under the topic ERTMS in the form of unit contribution[1].

Projects must comply with the provisions of Directive (EU) 2016/797[2] and with the related Technical Specifications for Interoperability. Where relevant, projects shall also be compatible with the alignment of operating procedures across borders in order to ensure the most effective use of the supported infrastructure.

Facilities and infrastructure supported under CEF must be accessible for use by all operators on a non-discriminatory basis.

[1] Decision authorising the use of unit contributions to support the deployment of ERTMS, electric vehicles recharging infrastructure and the retrofitting of noisy wagons under CEF Transport – 22 July 2021.

[2] Directive (EU) 2016/797 of the European Parliament and of the Council of 11 May 2016 on the interoperability of the rail system within the European Union (OJ L 138, 26.5.2016, p. 44) which replaces Directive 2008/57/EC as of 31 October 2020.

Eligibility & Conditions

Conditions

1. Admissibility Conditions: Proposal page limit and layout

described in section 5 of the call document.

2. Eligible Countries

described in section 6 of the call document.

3. Other Eligible Conditions

described in section 6 of the call document.

5a. Evaluation and award: Submission and evaluation processes

described section 8 of the call document and the Online Manual.

5b. Evaluation and award: Award criteria, scoring and thresholds

described in section 9 of the call document.

5c. Evaluation and award: Indicative timeline for evaluation and grant agreement

described in section 4 of the call document.

6. Legal and financial set-up of the grants

described in section 10 of the call document.

Support & Resources

For help related to this call, please contact [email protected]

Funding & Tenders Portal FAQ – Submission of proposals.

IT Helpdesk – Contact the IT helpdesk for questions such as forgotten passwords, access rights and roles, technical aspects of submission of proposals, etc.

Online Manual – Step-by-step online guide through the Portal processes from proposal preparation and evaluation to reporting on your ongoing project. Valid for all 2021-2027 programmes.

Latest Updates

Last Changed: July 15, 2025

Information update on the 2024 CEF Transport COMPCOEN call

Call published: 24/09/2024

Call deadline: 21/01/2025

Indicative budget: EUR 150 000 000

Total budget requested by the applicants: EUR 127 717 110.60



Number of admissible and eligible proposals:  5

Number of inadmissible proposals: 3

Number of ineligible proposals: 0

Number of successful proposals: 1

Total budget for the successful proposals: EUR 18 665 314.05  

 

List of successful projects under the 2024 CEF Transport call for proposals

List of funded projects under CEF

Last Changed: February 12, 2025

The nine CEF Transport calls for proposals closed on 21 January 2025. In total, 258 proposals were submitted requesting over €9.5 billion co-funding from the CEF Transport budget. It is nearly 4 times more than the €2.5 billion available for these calls

The COMPCOEN call received 8 applications for a requested funding of over EUR 127 million from the CEF Transport budget.

CINEA will first check the admissibility and eligibility of the proposals. The evaluation will continue with the support of independent external experts. The results will be made available to applicants in July 2025.

Last Changed: September 24, 2024
The submission session is now available for: CEF-T-2024-COMPCOEN-MARP-WORKS, CEF-T-2024-COMPCOEN-ROADS-WORKS, CEF-T-2024-COMPCOEN-IWWP-WORKS, CEF-T-2024-COMPCOEN-RAIL-WORKS
Rail – studies, works or mixed | Grantalist