Closed

Inland ports – studies, works or mixed

CEF Infrastructure Projects

Basic Information

Identifier
CEF-T-2024-COMPCOEN-IWWP-WORKS
Programme
CEF 2 Transport - Projects on the Comprehensive Network - Cohesion envelope
Programme Period
2021 - 2027
Status
Closed (31094503)
Opening Date
September 24, 2024
Deadline
January 21, 2025
Deadline Model
single-stage
Budget
€150,000,000
Min Grant Amount
Max Grant Amount
Expected Number of Grants
Keywords
CEF-T-2024-COMPCOEN-IWWP-WORKSCEF-T-2024-COMPCOEN

Description

Objective:

The objective is to develop inland waterways transport infrastructure projects related to inland ports on the TEN-T comprehensive network.

Scope:

Studies and / or works on TEN-T comprehensive inland ports, related to:

  • access, including safe access through navigational aids, of inland ports to inland waterways;
  • basic and water-side infrastructure in inland ports, including shore-side electricity supply;
  • port reception facilities for oil and other waste (including residues from exhaust gas cleaning systems) and infrastructure for degassing vessels to meet environmental requirements;
  • providing or improving rail access to, and connections within, inland ports. Road access and connections to/within inland ports will not be supported;
  • ensuring year-round navigability by means of e.g. hydrological services, ice-breaking facilities and dredging of the port and port approaches.

Any internal service road, maintenance road, access road, etc., from/to/on quays, berths, terminals, rail yards, or any other location within the inland port, even if needed for the Action implementation, will not be supported.

Works projects may include on-site renewable energy generation as a synergetic element in accordance with Section 10.6 of the Work Programme, such as grid connection from the port to the grid outside of the port needed for the shore-side electricity supply, photovoltaic power plants, wind turbines etc. that is primarily used for example for the shore-side electricity supply, for the need of the basic port infrastructure and for diverse port operations. Such synergetic elements must improve the socio-economic, climate or environmental benefits of the project and may not exceed 20% of the total eligible costs of the project.

Waterside infrastructure development projects mean infrastructure that enhances the navigability capacity in the inland waterways section of the revised TEN-T Regulation or improves the multimodal connection of waterborne transport operations. This excludes infrastructure that does not directly benefit waterborne transport operations.

Elements of storage, transhipment facilities and equipment may be included in a project benefiting inland waterway transport only if they are fully integrated in, and a minor part of the infrastructure investment project. These projects should not aim to focus on storing and transhipment facilities and equipment, but rather on the transport infrastructure.

Support will not be given to infrastructure dedicated for cruise ships, except as regards shore-side electricity supply.

Hinterland connections to the inland ports are covered by the respective transport mode priorities but may be part of a single project (for instance a project improving the rail access both within and outside the port area). Projects combining hinterland access both within and outside the port area may be submitted either to the inland port or to the maritime port/rail topics as appropriate.

Facilities and infrastructure supported under CEF must be accessible for use by all operators on a non-discriminatory basis.

Eligibility & Conditions

Conditions

1. Admissibility Conditions: Proposal page limit and layout

described in section 5 of the call document.

2. Eligible Countries

described in section 6 of the call document.

3. Other Eligible Conditions

described in section 6 of the call document.

5a. Evaluation and award: Submission and evaluation processes

described section 8 of the call document and the Online Manual.

5b. Evaluation and award: Award criteria, scoring and thresholds

described in section 9 of the call document.

5c. Evaluation and award: Indicative timeline for evaluation and grant agreement

described in section 4 of the call document.

6. Legal and financial set-up of the grants

described in section 10 of the call document.

Support & Resources

For help related to this call, please contact [email protected]

Funding & Tenders Portal FAQ – Submission of proposals.

IT Helpdesk – Contact the IT helpdesk for questions such as forgotten passwords, access rights and roles, technical aspects of submission of proposals, etc.

Online Manual – Step-by-step online guide through the Portal processes from proposal preparation and evaluation to reporting on your ongoing project. Valid for all 2021-2027 programmes.

Latest Updates

Last Changed: July 15, 2025

Information update on the 2024 CEF Transport COMPCOEN call

Call published: 24/09/2024

Call deadline: 21/01/2025

Indicative budget: EUR 150 000 000

Total budget requested by the applicants: EUR 127 717 110.60



Number of admissible and eligible proposals:  5

Number of inadmissible proposals: 3

Number of ineligible proposals: 0

Number of successful proposals: 1

Total budget for the successful proposals: EUR 18 665 314.05  

 

List of successful projects under the 2024 CEF Transport call for proposals

List of funded projects under CEF

Last Changed: February 12, 2025

The nine CEF Transport calls for proposals closed on 21 January 2025. In total, 258 proposals were submitted requesting over €9.5 billion co-funding from the CEF Transport budget. It is nearly 4 times more than the €2.5 billion available for these calls

The COMPCOEN call received 8 applications for a requested funding of over EUR 127 million from the CEF Transport budget.

CINEA will first check the admissibility and eligibility of the proposals. The evaluation will continue with the support of independent external experts. The results will be made available to applicants in July 2025.

Last Changed: September 24, 2024
The submission session is now available for: CEF-T-2024-COMPCOEN-MARP-WORKS, CEF-T-2024-COMPCOEN-ROADS-WORKS, CEF-T-2024-COMPCOEN-IWWP-WORKS, CEF-T-2024-COMPCOEN-RAIL-WORKS
Inland ports – studies, works or mixed | Grantalist