Inland waterways and ports – studies, works or mixed
CEF Infrastructure Projects
Basic Information
- Identifier
- CEF-T-2022-CORECOEN-IWWP-WORKS
- Programme
- CEF 2 Transport - Projects on the Core Network – Cohesion envelope
- Programme Period
- 2021 - 2027
- Status
- Closed (31094503)
- Opening Date
- September 13, 2022
- Deadline
- January 18, 2023
- Deadline Model
- single-stage
- Budget
- €2,000,000,000
- Min Grant Amount
- –
- Max Grant Amount
- –
- Expected Number of Grants
- –
- Keywords
- CEF-T-2022-CORECOEN-IWWP-WORKSCEF-T-2022-CORECOEN
Description
The objective is to develop inland waterways transport infrastructure projects on the Core Network of the TEN-T.
Scope:studies and / or works on inland waterways, related to:
- upgrade of waterways and related infrastructure such as locks and weirs/dams in order to achieve stable or improved navigation conditions, performance and/or more capacity for the passage of vessels or to ensure good navigation status;
- creation of new waterways and related infrastructure (locks, weirs/dams, bridges);
- construction/lifting/upgrading of locks and movable bridges, to improve the passage of vessels and convoys;
- automation of waterway infrastructure (e.g. locks, weirs/dams, bridges) to improve its operation and monitoring;
- increasing of under-bridge clearance;
- ensuring year-round navigability e.g. by means of hydrological services, ice-breaking facilities and capital dredging;
- waterside infrastructure including the creation and/or upgrade of infrastructure for mooring and waterborne operations along a waterway. This means that works can concern infrastructure and facilities for mooring and waterborne operations along the TEN-T waterways at sites which are not included in the Annex II.2 of the TEN-T Regulation n°1315/2013. These can only concern the development of waterside infrastructure such as quays for mooring and/or transhipments and/or shoreside electricity installation.
- interconnection between inland waterways and maritime transport.
Studies and / or works on inland ports, with the possibility to include studies, related to:
- access, including safe access through navigational aids, of inland ports to inland waterways;
- basic and water-side infrastructure in inland ports, including shore-side electricity supply;
- port reception facilities for oil and other waste (including residues from exhaust gas cleaning systems) and infrastructure for degassing vessels to meet environmental requirements;
- providing or improving road/rail access and connections within inland ports;
- ensuring year-round navigability by means of e.g. hydrological services, ice-breaking facilities and dredging of the port and port approaches.
Water-side infrastructure development projects shall mean infrastructure that enhances the navigability capacity in the meaning of Articles 15 and 16 of Regulation (EU) No 1315/2013 or improves the multimodal connection of waterborne transport operations. This excludes infrastructure that does not directly benefit waterborne transport operations.
Waterside infrastructure development projects that improve the navigability capacity and the multimodal connection of waterborne transport can include elements of storage and transhipment facilities and equipment. However, these are only eligible if they are fully integrated in, and a minor part of, an inland waterborne infrastructure project. In other words, proposals that focus on storing and transhipment facilities and equipment rather than on infrastructure will not be considered eligible. Moreover, facilities and equipment that are not used specifically for transhipment from/to inland waterway transport will also not be considered eligible.
Support will not be given to infrastructure dedicated to cruise ships, except as regards shore-side electricity supply.
Hinterland connections to the inland ports are covered by the respective transport mode priorities but may be part of a single project (for instance a project improving the rail access both within and outside the port area).
In accordance with Article 9(2)(a)(i) of the CEF Regulation, projects addressing the Core Network may include related elements on the Comprehensive Network, when necessary to optimize the investment. These elements may form up to 10% of the total eligible costs of the project and shall be presented as a separate work package.
Facilities and infrastructure supported under CEF must be accessible for use by all operators on a non-discriminatory basis.
Eligibility & Conditions
Conditions
Conditions
1. Admissibility conditions: described in section 5 of the call document
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System
2. Eligible countries: described in section 6 of of the call document
3. Other eligibility conditions: described in section 6 of the call document
4. Financial and operational capacity and exclusion: described in section 7 of the call document
- Submission and evaluation processes: described section 8 of the call document and the Online Manual
- Award criteria, scoring and thresholds: described in section 9 of the call document
- Indicative timeline for evaluation and grant agreement: described in section 4 of the call document
6. Legal and financial set-up of the grants: described in section 10 of the call document
Documents
Call document:
Call document CEF-T-2022-CORECOEN
Application form and annexes:
Proposals (including annexes and supporting documents) must be submitted using the forms provided inside the Submission System (NOT the documents available on the Topic page - these are only for information).
Application form (Part A and B)
Letter of support (MS agreement)
Support & Resources
For help related to this call, please contact: [email protected]
Funding & Tenders Portal FAQ – Submission of proposals.
IT Helpdesk – Contact the IT helpdesk for questions such as forgotten passwords, access rights and roles, technical aspects of submission of proposals, etc.
Online Manual – Step-by-step online guide through the Portal processes from proposal preparation and submission to reporting on your on-going project. Valid for all 2021-2027 programmes.
Latest Updates
Information update on the 2022 CORECOEN call
Call published: 13/09/2022
Call deadline: 18/01/2023
Indicative budget: EUR 2 000 000 000
Total budget requested by the applicants: EUR 6 305 115 628
Number of admissible and eligible proposals: 44
Number of inadmissible proposals: 0
Number of ineligible proposals: 0
Number of successful proposals: 21
Total budget for the successful proposals: EUR 2 593 086 353*
*The budget flexibility provision of the Work Programme 2021-2027 has been applied.
List of successful projects under the 2022 CEF Transport call for proposals.
List of funded projects under CEF
For questions, please contact [email protected]
15/12/2022 11:12
There are few days left to finish your application in response to any of the 9 CEF Transport calls for proposals, closing on 18 January 2023 at 17:00. In total, 41 topics are open for submission on the Funding & Tenders portal.
We strongly advise you not to wait until the last minute to submit your application!
You may also see the Call page, and the Info Day page to find the presentations and recording of the info day session. More than 600 FAQs are now available on the FAQ support on the Funding & Tenders portal.
To be admissible your application must contain Part A and the GIS duly completed online, and Part B uploaded on time. As indicated in section 5 of the Call document – also available on the Reference Documents of the portal, the mandatory annexes must also be submitted. These documents concern:
- Agreement by the concerned Member States benefitting from the project – for all applications
- Calculator for ERTMS and RFN applications or detailed budget table per Work Package for other applications
- Timetable/Gantt chart – for all applications
- Environmental compliance file including the required declarations for all applications (except ERTMS and RFN applications). Please see the FAQ 18080.
- Activity reports of last year and List of previous projects - unless exempted from operational capacity check such as public bodies, member state organisations, international organisations and beneficiaries of grants under CEF1 and CEF2.
In addition, if the application concerns works:
- Full cost-benefit analysis (CBA) report and CBA cash flow template - only for works or mixed projects with a budget (eligible costs) above EUR 10 million - unless exempted
- Simplified CBA calculator – only for works or mixed projects with a budget (eligible costs) below EUR 10 million - unless exempted
We wish you the best of luck in your application!
There are few days left to finish your application in response to any of the 9 CEF Transport calls for proposals, closing on 18 January 2023 at 17:00. In total, 41 topics are open for submission on the Funding & Tenders portal.
We strongly advise you not to wait until the last minute to submit your application!
You may also see the Call page, and the Info Day page to find the presentations and recording of the info day session. More than 600 FAQs are now available on the FAQ support on the Funding & Tenders portal.
To be admissible your application must contain Part A and the GIS duly completed online, and Part B uploaded on time. As indicated in section 5 of the Call document – also available on the Reference Documents of the portal, the mandatory annexes must also be submitted. These documents concern:
- Agreement by the concerned Member States benefitting from the project – for all applications
- Calculator for ERTMS and RFN applications or detailed budget table per Work Package for other applications
- Timetable/Gantt chart – for all applications
- Environmental compliance file including the required declarations for all applications (except ERTMS and RFN applications). Please see the FAQ 18080.
- Activity reports of last year and List of previous projects - unless exempted from operational capacity check such as public bodies, member state organisations, international organisations and beneficiaries of grants under CEF1 and CEF2.
In addition, if the application concerns works:
- Full cost-benefit analysis (CBA) report and CBA cash flow template - only for works or mixed projects with a budget (eligible costs) above EUR 10 million - unless exempted
- Simplified CBA calculator – only for works or mixed projects with a budget (eligible costs) below EUR 10 million - unless exempted
We wish you the best of luck in your application!