Closed

Inland ports – studies, works or mixed

CEF Infrastructure Projects

Basic Information

Identifier
CEF-T-2022-COMPGEN-IWWP-WORKS
Programme
CEF 2 Transport - Projects on the Comprehensive Network – General envelope
Programme Period
2021 - 2027
Status
Closed (31094503)
Opening Date
September 13, 2022
Deadline
January 18, 2023
Deadline Model
single-stage
Budget
€250,000,000
Min Grant Amount
Max Grant Amount
Expected Number of Grants
Keywords
CEF-T-2022-COMPGEN-IWWP-WORKSCEF-T-2022-COMPGEN

Description

Objective:

The objective is to develop inland waterways transport infrastructure projects on the Comprehensive Network of the TEN-T.

Scope:

studies and / or works on inland ports, related to:

  • access, including safe access through navigational aids, of inland ports to inland waterways;
  • basic and water-side infrastructure in inland ports, including shore-side electricity supply;
  • port reception facilities for oil and other waste (including residues from exhaust gas cleaning systems) and infrastructure for degassing vessels to meet environmental requirements;
  • providing or improving road/rail access and connections within inland ports;
  • ensuring year-round navigability by means of e.g. hydrological services, ice-breaking facilities and dredging of the port and port approaches.

Water-side infrastructure development projects shall mean infrastructure that enhances the navigability capacity in the meaning of Articles 15 and 16 of Regulation (EU) No 1315/2013 or improves the multimodal connection of waterborne transport operations. This excludes infrastructure that does not directly benefit waterborne transport operations.

Waterside infrastructure development projects that improve the navigability capacity and the multimodal connection of waterborne transport can include elements of storage and transhipment facilities and equipment. However, these are only eligible if they are fully integrated in, and a minor part of, an inland waterborne infrastructure project. In other words, proposals that focus on storing and transhipment facilities and equipment rather than on infrastructure will not be considered eligible. Moreover, facilities and equipment that are not used specifically for transhipment from/to inland waterway transport will also not be considered eligible.

Support will not be given to infrastructure dedicated to cruise ships, except as regards shore-side electricity supply.

Hinterland connections to the inland ports are covered by the respective transport mode priorities but may be part of a single project (for instance an project improving the rail access both within and outside the port area).

Facilities and infrastructure supported under CEF must be accessible for use by all operators on a non-discriminatory basis.

Eligibility & Conditions

Conditions

Conditions



1. Admissibility conditions: described in section 5 of the call document 

Proposal page limits and layout: described in Part B of the Application Form available in the Submission System

2. Eligible countries: described in section 6 of of the call document

3. Other eligibility conditions: described in section 6 of the call document

4. Financial and operational capacity and exclusion: described in section 7 of the call document

  •  Award criteria, scoring and thresholds: described in section 9 of the call document

  •  Indicative timeline for evaluation and grant agreement: described in section 4 of the call document

6. Legal and financial set-up of the grants: described in section 10 of the call document

Support & Resources

For help related to this call, please contact: [email protected]

Funding & Tenders Portal FAQ – Submission of proposals.

IT Helpdesk – Contact the IT helpdesk for questions such as forgotten passwords, access rights and roles, technical aspects of submission of proposals, etc.

Online Manual – Step-by-step online guide through the Portal processes from proposal preparation and submission to reporting on your on-going project. Valid for all 2021-2027 programmes.

Latest Updates

Last Changed: September 18, 2023

Information update on the 2022 COMPGEN call

Call published: 13/09/2022

Call deadline: 18/01/2023

Indicative budget: EUR 250 000 000

Total budget requested by the applicants: EUR 619 682 489

Number of admissible and eligible proposals: 41

Number of inadmissible proposals: 1

Number of ineligible proposals: 0

Number of successful proposals: 16

Total budget for the successful proposalsl: EUR 101 434 242

 

List of successful projects under the 2022 CEF Transport call for proposals

List of funded projects under CEF

For questions, please contact [email protected]

 

15/12/2022 11:09

There are few days left to finish your application in response to any of the 9 CEF Transport calls for proposals, closing on 18 January 2023 at 17:00. In total, 41 topics are open for submission on the  Funding & Tenders portal.

 

We strongly advise you not to wait until the last minute to submit your application!

You may also see the Call page, and the Info Day page to find the presentations and recording of the info day session. More than 600 FAQs are now available on the FAQ support on the Funding & Tenders portal.

To be admissible your application must contain Part A and the GIS duly completed online, and Part B uploaded on time. As indicated in section 5 of the Call document – also available on the Reference Documents of the portal, the mandatory annexes must also be submitted. These documents concern:

-          Agreement by the concerned Member States benefitting from the project  – for all applications

-          Calculator for ERTMS and RFN applications or detailed budget table per Work Package for other applications

-          Timetable/Gantt chart – for all applications

-          Environmental compliance file including the required declarations for all applications (except ERTMS and RFN applications). Please see the FAQ 18080.

-          Activity reports of last year and List of previous projects - unless exempted from operational capacity check such as public bodies, member state organisations, international organisations and beneficiaries of grants under CEF1 and CEF2.   

In addition, if the application concerns works:

-          Full cost-benefit analysis (CBA) report and CBA cash flow template - only for works or mixed projects with a budget (eligible costs) above EUR 10 million - unless exempted

-          Simplified CBA calculator – only for works or mixed projects with a budget (eligible costs) below EUR 10 million - unless exempted

We wish you the best of luck in your application!

 

Last Changed: December 15, 2022

There are few days left to finish your application in response to any of the 9 CEF Transport calls for proposals, closing on 18 January 2023 at 17:00. In total, 41 topics are open for submission on the  Funding & Tenders portal.

We strongly advise you not to wait until the last minute to submit your application!

You may also see the Call page, and the Info Day page to find the presentations and recording of the info day session. More than 600 FAQs are now available on the FAQ support on the Funding & Tenders portal.

To be admissible your application must contain Part A and the GIS duly completed online, and Part B uploaded on time. As indicated in section 5 of the Call document – also available on the Reference Documents of the portal, the mandatory annexes must also be submitted. These documents concern:

-          Agreement by the concerned Member States benefitting from the project  – for all applications

-          Calculator for ERTMS and RFN applications or detailed budget table per Work Package for other applications

-          Timetable/Gantt chart – for all applications

-          Environmental compliance file including the required declarations for all applications (except ERTMS and RFN applications). Please see the FAQ 18080.

-          Activity reports of last year and List of previous projects - unless exempted from operational capacity check such as public bodies, member state organisations, international organisations and beneficiaries of grants under CEF1 and CEF2.   

In addition, if the application concerns works:

-          Full cost-benefit analysis (CBA) report and CBA cash flow template - only for works or mixed projects with a budget (eligible costs) above EUR 10 million - unless exempted

-          Simplified CBA calculator – only for works or mixed projects with a budget (eligible costs) below EUR 10 million - unless exempted

We wish you the best of luck in your application!

Last Changed: September 13, 2022