Multimodal passenger hubs – works or mixed
CEF Infrastructure Projects
Basic Information
- Identifier
- CEF-T-2021-SUSTMOBGEN-MULTHUB-WORKS
- Programme
- CEF 2 Transport - Actions related to sustainable and multimodal mobility – General envelope
- Programme Period
- 2021 - 2027
- Status
- Closed (31094503)
- Opening Date
- September 16, 2021
- Deadline
- January 19, 2022
- Deadline Model
- single-stage
- Budget
- €100,000,000
- Min Grant Amount
- –
- Max Grant Amount
- –
- Expected Number of Grants
- –
- Keywords
- CEF-T-2021-SUSTMOBGEN-MULTHUB-WORKSCEF-T-2021-SUSTMOBGEN
Description
The general objective is to modernise transport infrastructure on the Core and Comprehensive Networks of the TEN-T.
Scope:In accordance with Article 9(2)(b)(vi) of the CEF Regulation, Actions aiming at seamless connections between modes will be supported.
The works, with the possibility to include studies, that are supported relate to Actions that:
- shall be located in an urban node of the Core Network in line with Annex II part 1 of Regulation (EU) No 1315/2013;
- shall be part of a Sustainable Urban Mobility Plan established in accordance with the 2019 Guidelines for Developing and Implementing a Sustainable Urban Mobility Plan (https://www.eltis.org/sites/default/files/sump-guidelines-2019_mediumres.pdf) or of an equivalent plan;
- shall improve accessibility for all users, especially for passengers with reduced mobility;
- shall allow for the connection with available long-distance transport modes (land connections to/between railway stations and/or airports and/or ports); note that rail connections are covered under the CEF 2 transport calls for projects on the Core and Comprehensive Networks (General and Cohesion envelopes) (call ID’s: CEF-T-2021-COREGEN, CEF-T-2021-CORECOEN, CEF-T-2021-COMPGEN en CEF-T-2021-COMPCOEN); connections with other type of public transport infrastructure will only be supported where rail connections do not exist and are not planned;
- may include safe connection with cycle infrastructure, allow safe connections with shared mobility solutions.
The foreseen duration of the action should be 4-5 years maximum.
Eligibility & Conditions
Conditions
Conditions
1. Admissibility conditions: described in section 5 of the call document
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System
2. Eligible countries: described in section 6 of of the call document
3. Other eligibility conditions: described in section 6 of the call document
4. Financial and operational capacity and exclusion: described in section 7 of the call document
- Submission and evaluation processes: described section 8 of the call document and the Online Manual
- Award criteria, scoring and thresholds: described in section 9 of the call document
- Indicative timeline for evaluation and grant agreement: described in section 4 of the call document
6. Legal and financial set-up of the grants: described in section 10 of the call document
Documents
Call documents:
Call document CEF-T-2021-SUSTMOBGEN
Application form and annexes:
Proposals (including annexes and supporting documents) must be submitted using the forms provided inside the Submission System (NOT the documents available on the Topic page - these are only for information).
Application form (Part A and B)
Letter of support (MS agreement)
Decision on unit costs for SME owners
Decision on unit costs for personnel (usual cost accounting practices)
Support & Resources
For help related to this call, please contact: [email protected]
Funding & Tenders Portal FAQ – Submission of proposals.
IT Helpdesk – Contact the IT helpdesk for questions such as forgotten passwords, access rights and roles, technical aspects of submission of proposals, etc.
Online Manual – Step-by-step online guide through the Portal processes from proposal preparation and submission to reporting on your on-going project. Valid for all 2021-2027 programmes.
Latest Updates
CALL UPDATE: FLASH EVALUATION RESULTS
EVALUATION results
Published: 16/09/2021
Deadline: 19/01/2022
Indicative available budget: EUR 100 000 000
The results of the evaluation are as follows:
Number of proposals submitted: 15
Total funding requested for submitted proposals: EUR 70 408 991
Number of inadmissible proposals: 0
Number of ineligible proposals: 1
Number of selected proposals: 8
Total recommended funding for selected proposals: EUR 41 822 877
We recently informed the applicants about the evaluation results for their proposals.
For questions, please contact [email protected]