Multimodal passenger hubs – studies
CEF Project Grants
Basic Information
- Identifier
- CEF-T-2021-SUSTMOBGEN-MULTHUB-STUDIES
- Programme
- CEF 2 Transport - Actions related to sustainable and multimodal mobility – General envelope
- Programme Period
- 2021 - 2027
- Status
- Closed (31094503)
- Opening Date
- September 16, 2021
- Deadline
- January 19, 2022
- Deadline Model
- single-stage
- Budget
- €100,000,000
- Min Grant Amount
- –
- Max Grant Amount
- –
- Expected Number of Grants
- –
- Keywords
- CEF-T-2021-SUSTMOBGEN-MULTHUB-STUDIESCEF-T-2021-SUSTMOBGEN
Description
The general objective is to modernise transport infrastructure on the Core and Comprehensive Networks of the TEN-T.
Scope:In accordance with Article 9(2)(b)(vi) of the CEF Regulation, Actions aiming at seamless connections between modes will be supported.
The studies that are supported relate to Actions that:
- shall be located in an urban node of the Core Network in line with Annex II part 1 of Regulation (EU) No 1315/2013;
- shall be part of a Sustainable Urban Mobility Plan established in accordance with the 2019 Guidelines for Developing and Implementing a Sustainable Urban Mobility Plan (https://www.eltis.org/sites/default/files/sump-guidelines-2019_mediumres.pdf) or of an equivalent plan;
- shall improve accessibility for all users, especially for passengers with reduced mobility;
- shall allow for the connection with available long-distance transport modes (land connections to/between railway stations and/or airports and/or ports); note that rail connections are covered under the CEF 2 transport calls for projects on the Core and Comprehensive Networks (General and Cohesion envelopes) (call ID’s: CEF-T-2021-COREGEN, CEF-T-2021-CORECOEN, CEF-T-2021-COMPGEN en CEF-T-2021-COMPCOEN); connections with other type of public transport infrastructure will only be supported where rail connections do not exist and are not planned;
- may include safe connection with cycle infrastructure, allow safe connections with shared mobility solutions.
The foreseen duration of the action should be 2-3 years maximum.
Eligibility & Conditions
Conditions
Conditions
1. Admissibility conditions: described in section 5 of the call document
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System
2. Eligible countries: described in section 6 of of the call document
3. Other eligibility conditions: described in section 6 of the call document
4. Financial and operational capacity and exclusion: described in section 7 of the call document
- Submission and evaluation processes: described section 8 of the call document and the Online Manual
- Award criteria, scoring and thresholds: described in section 9 of the call document
- Indicative timeline for evaluation and grant agreement: described in section 4 of the call document
6. Legal and financial set-up of the grants: described in section 10 of the call document
Documents
Call documents:
Call document CEF-T-2021-SUSTMOBGEN
Application form and annexes:
Proposals (including annexes and supporting documents) must be submitted using the forms provided inside the Submission System (NOT the documents available on the Topic page - these are only for information).
Application form (Part A and B)
Letter of support (MS agreement)
Decision on unit costs for SME owners
Decision on unit costs for personnel (usual cost accounting practices)
Support & Resources
For help related to this call, please contact: [email protected]
Funding & Tenders Portal FAQ – Submission of proposals.
IT Helpdesk – Contact the IT helpdesk for questions such as forgotten passwords, access rights and roles, technical aspects of submission of proposals, etc.
Online Manual – Step-by-step online guide through the Portal processes from proposal preparation and submission to reporting on your on-going project. Valid for all 2021-2027 programmes.
Latest Updates
CALL UPDATE: FLASH EVALUATION RESULTS
EVALUATION results
Published: 16/09/2021
Deadline: 19/01/2022
Indicative available budget: EUR 100 000 000
The results of the evaluation are as follows:
Number of proposals submitted: 15
Total funding requested for submitted proposals: EUR 70 408 991
Number of inadmissible proposals: 0
Number of ineligible proposals: 1
Number of selected proposals: 8
Total recommended funding for selected proposals: EUR 41 822 877
We recently informed the applicants about the evaluation results for their proposals.
For questions, please contact [email protected]