Closed

Roads, rail-road terminals and multimodal logistics platforms – studies

CEF Project Grants

Basic Information

Identifier
CEF-T-2021-COREGEN-ROADS-STUDIES
Programme
CEF 2 Transport - Projects on the Core Network – General envelope
Programme Period
2021 - 2027
Status
Closed (31094503)
Opening Date
September 16, 2021
Deadline
January 19, 2022
Deadline Model
single-stage
Budget
€1,620,000,000
Min Grant Amount
Max Grant Amount
Expected Number of Grants
Keywords
CEF-T-2021-COREGEN-ROADS-STUDIESCEF-T-2021-COREGEN

Description

Objective:

The objective is to develop road infrastructure projects, rail-road terminals and multimodal logistics platforms on the Core Network of the TEN-T.

Scope:

Studies on roads, rail-road terminals and multimodal logistics platforms related to:

  • pre-identified road links as stipulated in Section 1 of Part III of the Annex of the CEF Regulation, in particular cross-border links on the Core Network;
  • components of the Core road Networks located in Member States which do not have a land border with another Member State as stipulated in Section 3 of Part III of the Annex of the CEF Regulation;
  • improving road connections to maritime and inland ports and rail-road terminals as listed in Annex II of Regulation (EU) No 1315/2013 as long as the actions do not aim at increasing road transport capacity, but address a significant bottleneck;
  • construction or upgrade of rail-road terminals as listed in Annex II of Regulation (EU) No 1315/2013, combined transport transhipment points and other publicly accessible multimodal logistics platforms located on the TEN-T Network, including connecting or siding tracks, power connections, safe and secure truck waiting areas, adaptations for 740 m train length, clean transhipment equipment for intermodal loading units, including specific equipment for rolling motorways and the transportation of semi-trailers by rail, and ICT equipment and applications.

Support will not be given to buildings, storage and warehouse facilities. Actions addressing roads shall be compliant with Directive (EU) 2019/1936 (Directive 2019/1936 of the European Parliament and of the Council of 23 October 2019 amending Directive 2008/96/EC on road infrastructure safety management (OJ L 305, 26.11.2019, p. 1)) and Directive (EU) 2004/54/EC (Directive 2004/54/EC of the European Parliament and of the Council of 29 April 2004 on minimum safety requirements for tunnels in the Trans-European Road Network (OJ L 167, 30.4.2004, p. 39–91)).

In accordance with Article 9(2)(a)(i) of the CEF Regulation, Actions addressing the Core Network may include related elements on the Comprehensive Network, when necessary to optimize the investment. These elements may form up to 10% of the total eligible costs of the Action and shall be presented as a separate work package.

Facilities and infrastructure supported under CEF must be accessible for use by all operators on a non-discriminatory basis.

The foreseen duration of the action should be 2-3 years maximum.

Eligibility & Conditions

Conditions

Conditions



1. Admissibility conditions: described in section 5 of the call document 

Proposal page limits and layout: described in Part B of the Application Form available in the Submission System

2. Eligible countries: described in section 6 of of the call document

3. Other eligibility conditions: described in section 6 of the call document

4. Financial and operational capacity and exclusion: described in section 7 of the call document

  •  Award criteria, scoring and thresholds: described in section 9 of the call document

  •  Indicative timeline for evaluation and grant agreement: described in section 4 of the call document

6. Legal and financial set-up of the grants: described in section 10 of the call document

Support & Resources

For help related to this call, please contact: [email protected]

Funding & Tenders Portal FAQ – Submission of proposals.

IT Helpdesk – Contact the IT helpdesk for questions such as forgotten passwords, access rights and roles, technical aspects of submission of proposals, etc.

Online Manual – Step-by-step online guide through the Portal processes from proposal preparation and submission to reporting on your on-going project. Valid for all 2021-2027 programmes.

Latest Updates

Last Changed: July 5, 2022

CALL UPDATE: FLASH EVALUATION RESULTS

 

EVALUATION results

 

Published: 16/09/2021

Deadline: 19/01/2022

Indicative available budget: EUR 1 620 000 000

The results of the evaluation are as follows:

Number of proposals submitted: 153

Total funding requested for submitted proposals: EUR 6 510 795 417

Number of inadmissible proposals: 4

Number of ineligible proposals: 4

Number of selected proposals: 35

Total recommended funding for selected proposals: EUR 1 740 082 469

We recently informed the applicants about the evaluation results for their proposals.

For questions, please contact [email protected]

 

Last Changed: September 24, 2021
The submission session is now available for: CEF-T-2021-COREGEN-MARP-WORKS(CEF-INFRA), CEF-T-2021-COREGEN-IWWP-STUDIES(CEF-PJG), CEF-T-2021-COREGEN-ROADS-STUDIES(CEF-PJG), CEF-T-2021-COREGEN-IWWP-WORKS(CEF-INFRA), CEF-T-2021-COREGEN-RAIL-WORKS(CEF-INFRA), CEF-T-2021-COREGEN-RAIL-STUDIES(CEF-PJG), CEF-T-2021-COREGEN-MARP-STUDIES(CEF-PJG), CEF-T-2021-COREGEN-ROADS-WORKS(CEF-INFRA)
Roads, rail-road terminals and multimodal logistics platforms – studies | Grantalist