Closed

Maritime ports – works or mixed

CEF Infrastructure Projects

Basic Information

Identifier
CEF-T-2021-COMPGEN-MARP-WORKS
Programme
CEF 2 Transport - Projects on the Comprehensive Network – General envelope
Programme Period
2021 - 2027
Status
Closed (31094503)
Opening Date
September 16, 2021
Deadline
January 19, 2022
Deadline Model
single-stage
Budget
€250,000,000
Min Grant Amount
Max Grant Amount
Expected Number of Grants
Keywords
CEF-T-2021-COMPGEN-MARP-WORKSCEF-T-2021-COMPGEN

Description

Objective:

The objective is to develop infrastructure projects in maritime ports on the Comprehensive Network of the TEN-T.

Scope:

Works on comprehensive maritime ports, with the possibility to include studies, related to:

  • port access aiming at providing safe maritime access in the form of breakwaters, access channels, fairways, locks and navigational aids;
  • basic port infrastructure, with a priority on:
    • development of zero or low-emission multimodal solutions, or;
    • development of ports´ capacities and facilities in relation with offshore wind farms, or;
    • improving connectivity of remote, insular or outermost regions (as defined in Article 349 TFEU) or of Member States with no land border with another Member State;
  • shore-side electricity supply;
  • port reception facilities for oil and other waste (including residues from exhaust gas cleaning systems) to meet environmental requirements;
  • ensuring year-round navigability by means of capital dredging and ice-breaking facilities;
  • providing or improving road/rail access and connections within maritime ports.

Support will not be given to infrastructure dedicated for cruise ships, except as regards shore-side electricity supply.

Hinterland connections to the maritime ports are covered by the respective transport mode priorities but may be part of a single Action (for instance an Action improving the rail access both within and outside the port area).

The basic infrastructure for development of zero or low-emission multimodal solutions could include basic infrastructure for improving the interconnection between the maritime transport and inland waterways.

Facilities and infrastructure supported under CEF must be accessible for use by all operators on a non-discriminatory basis.

The foreseen duration of the action should be 4-5 years maximum.

Eligibility & Conditions

Conditions

Conditions



1. Admissibility conditions: described in section 5 of the call document 

Proposal page limits and layout: described in Part B of the Application Form available in the Submission System

2. Eligible countries: described in section 6 of of the call document

3. Other eligibility conditions: described in section 6 of the call document

4. Financial and operational capacity and exclusion: described in section 7 of the call document

  •  Award criteria, scoring and thresholds: described in section 9 of the call document

  •  Indicative timeline for evaluation and grant agreement: described in section 4 of the call document

6. Legal and financial set-up of the grants: described in section 10 of the call document

Support & Resources

For help related to this call, please contact: [email protected]

Funding & Tenders Portal FAQ – Submission of proposals.

IT Helpdesk – Contact the IT helpdesk for questions such as forgotten passwords, access rights and roles, technical aspects of submission of proposals, etc.

Online Manual – Step-by-step online guide through the Portal processes from proposal preparation and submission to reporting on your on-going project. Valid for all 2021-2027 programmes.

Latest Updates

Last Changed: July 5, 2022

CALL UPDATE: FLASH EVALUATION RESULTs

 

EVALUATION results

 

Published: 16/09/2021

Deadline: 19/01/2022

Indicative available budget: EUR 250 000 000

The results of the evaluation are as follows:

Number of proposals submitted: 31

Total funding requested for submitted proposals: EUR 184.821.619

Number of inadmissible proposals: 1

Number of ineligible proposals: 0

Number of selected proposals: 24

Total recommended funding for selected proposals: EUR 141 812 580

We recently informed the applicants about the evaluation results for their proposals.

For questions, please contact [email protected]

 

Last Changed: September 24, 2021
The submission session is now available for: CEF-T-2021-COMPGEN-RAIL-STUDIES(CEF-PJG), CEF-T-2021-COMPGEN-MARP-STUDIES(CEF-PJG), CEF-T-2021-COMPGEN-RAIL-WORKS(CEF-INFRA), CEF-T-2021-COMPGEN-ROADS-WORKS(CEF-INFRA), CEF-T-2021-COMPGEN-IWWP-WORKS(CEF-INFRA), CEF-T-2021-COMPGEN-ROADS-STUDIES(CEF-PJG), CEF-T-2021-COMPGEN-IWWP-STUDIES(CEF-PJG), CEF-T-2021-COMPGEN-MARP-WORKS(CEF-INFRA)
Last Changed: September 20, 2021

 A new version of the call document was made available on 20.09.21 (update: section on funding rates - page 22).

Maritime ports – works or mixed | Grantalist